![CHESTER T Mill Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/chester/t-mill/t-mill_operation-manual_2596691009.webp)
Fig 2 Roller Bearing Position
7. Electrical System
The electrical control system has been installed on the left side of the machine head,
the electrical system of the horizontal spindle has been equipped under the right front.
The electrical system supplied has been specked to make machining easy and safe
to operate.
8. Transport
When transporting the machine, it must be moved and positioned carefully. Do not
knock the machine when lifting or lowering.
9. Troubleshooting
1. If the motor does not run, inspect the connection to the machine or check the power
source.
2. If the radial run out of the spindle is too large and is noisy and producing excessive
heat, check to see if the spindle is loose. If the spindle is loose, adjust the nut on
the spindle assembly.
3. If the machine wobbles, check the motor mounts, the levers, nuts, screws and the
machine head support on the spindle, if these are loose adjust and lock into
position.
4. If the spindle does not lower or raise easily, inspect the machine to see if there is
Содержание T Mill
Страница 11: ...10 Parts List and Diagram Column Parts...
Страница 14: ...Head...
Страница 17: ...Horizontal Spindle...
Страница 20: ...Gearbox...
Страница 23: ...Gear Head...
Страница 26: ...Table...
Страница 29: ...Installation Foundation Plan A B C D E F 845 466 760 1285 220 150...
Страница 30: ......
Страница 31: ......
Страница 32: ......