Replacing or Upgrading Memory
IP1280 Security Platform Installation Guide
109
3.
Loosen the four front panel retaining screws.
IP1280
RESET
00616a.1
CONSOLE
AUX
AUX2
HDD B
SLOT 3
SLOT 2
SLOT 1
HDD A
HOT SWAP
HOT SWAP
POWER
ACTIVITY
HARD DRIVE
STATUS
HOT SWAP
HOT SWAP
POWER
ACTIVITY
HARD DRIVE
STATUS
SLOT 4
1000BaseT
PC CARD
1
2
3
4
SUB SLOT 1
SUB SLOT 2
POWER
READY
REQUEST
HOT SWAP
FIO CARRIER
1000B-LX
ACT
LINK
SUB SLOT 1
SUB SLOT 2
POWER
READY
REQUEST
HOT SWAP
FIO CARRIER
1000B-LX
ACT
LINK
V2
1000BaseT
ACT
LINK
ACT
LINK
V2
1000BaseT
ACT
LINK
ACT
LINK
Chassis tray assembly screws
Содержание IP1280
Страница 6: ...6 Check Point IP1280 Security Platform Installation Guide ...
Страница 8: ...8 Check Point IP1280 Security Platform Installation Guide ...
Страница 10: ...10 Check Point IP1280 Security Platform Installation Guide ...
Страница 14: ...2 14 Check Point IP1280 Security Platform Installation Guide ...
Страница 36: ...2 Installing the Check Point IP1280 Appliance 36 Check Point IP1280 Security Platform Installation Guide ...
Страница 46: ...3 Performing the Initial Configuration 46 Check Point IP1280 Security Platform Installation Guide ...
Страница 81: ...Configuring Check Point IPSO for IP1280 ADP Interfaces IP1280 Security Platform Installation Guide 81 ...
Страница 130: ...A Technical Specifications 130 Check Point IP1280 Security Platform Installation Guide ...
Страница 134: ...B Compliance Information 134 Check Point IP1280 Security Platform Installation Guide ...
Страница 138: ...Index 138 IP1280 Security Platform Installation Guide ...