
3
EN
QUICK REFERENCE GUIDE
DRB-F100CM QRG Rev. 1
Mounting (Stacking)
Video panels can be stacked upon the DRB-F100CM for use with the Ground Support 2 Kit from CHAUVET.
Before using this product with the Ground Support 2 Kit, read the
, as well as those for the attached
products.
Mounting Diagram (Stacking)
Stacking Procedure
1. Insert alignment conicals into the alignment holes and allow magnets to connect.
2. Close the latches of the male speego connections on the F-series panel.
3. To detach the Rig Bar from the F-Series panel, reverse the previous steps.
Warning! The magnetic attachments are not load-bearing, and are intended for alignment assistance
only. Do not release panel until the hardware has been fully secured.
Alignment
Conical (x4)
Male Speego
Connection
Female Speego
Connection
(For use with
DRB Curve Kit or
Ground Support 2 Kit)
!