Intelect Legend XT® Therapy System
78
INSTALLATION/REMOVAL
MOUNTING THERAPY SYSTEM TO THERAPY SYSTEM CART
Follow the "Assembling Therapy System
Cart" instructions shipped with the Cart for
proper assembly. If the instruction sheet is
not available visit the Chattanooga Group
website, www.chattgroup.com, to obtain a
copy of the instruction sheet.
Assembling the Therapy System Cart
Preparing the Therapy System Cart
Remove all the Storage Bins from both
sides of the Therapy System Cart by pulling
each bin out and up.
REMOVE
ALL BINS
Allow approximately 4.5 in (11.5 cm) of
the power cord extending through the
top of the cart for connecting to system.
If the system is equipped with an optional
NiMH Battery, Laser or Channel 3/4
Electrotherapy Module, it will be necessary
to allow 6.5 in (16.5 cm) of the Power Cord
extending through the top of the Therapy
System Cart.
4.5 IN
11.5 CM
SYSTEM ONLY
6.5 IN
16.5 CM
SYSTEM W/MODULE
Position the Therapy System onto the
Therapy System Cart with the rear of the
System over the Mains Power Cord.
Secure the System to the cart with the four
socket head screws in the Therapy System
Cart Top.
HAND TIGHTEN THE SOCKET
HEAD SCREWS TO SECURE
SYSTEM TO CART
Mounting the Therapy System to Cart
NOTE:
Secure the System to the cart by
tightening the screws by hand
only. Do not use a wrench to
tighten the screws. Overtightening
may cause damage to the System
or Module housing.