21
Adjusting the Equipment Rails
1.
Use a 13 mm socket wrench to loosen (but do not remove) the nuts securing the equipment rail to
the frame in three (3) locations on 6-‐Slide cabinet or two (2) locations on 4-‐Slide cabinet.
2.
Move the equipment rail forward or backward to the desired location.
3.
Tighten the nuts in all three (3) locations on 6-‐Slide cabinet or two (2) locations on 4-‐Slide cabinet.
Markings are provided on the frame to help align the equipment rails so that they are vertical as well
as in the same location as the rails on the opposite side of the frame.
Installing the Standard PDU Brackets
1.
Choose the desired corner of the cabinet to install the PDU Brackets and install cage nuts in square
holes.
2.
Position PDU bracket against vertical frame member and install 2 screws through holes into cage
nuts. Torque screws to 168 in-‐lb (19 Nm) using a Phillips screw driver.
3.
Repeat for second PDU Bracket.