5.4 

The influent water temperature must be between 5 and 45°C. 
 

5.5 

Permeate and reject lines must be no smaller than the unit outlet size.  In the event of 
long pipe runs, increasing the pipe size diameter may be necessary. 

 
Ask for our suppliers engineer to consult on any item above that may be of concern.  
 

Caution: Please check the power supply is the correct voltage and current rating. Refer to 
the circuit diagram of RO main unit. 

 

6.0 Description of Operation 
 

6.1  Starting Up the Unit 

 

6.1.1 

Open the reject valve and recycle valves fully 

 

6.1.2 

Open feed water valve 

 

6.1.3 

Turn on the power supply. 

 

6.1.4 

Depress the RO Pump button 

 

6.1.5 

If the HIGH contacts are closed, after a short time delay the inlet valve will open 
and allow water to enter the system. This first stage will expel air to prevent 
damage to the membrane(s) [telescoping]. 

 

6.1.6 

The flush valve will be open (the high reject flow rate will not be visible in the 
reject rotameter).   

 

6.1.7 

After a few minutes the flush valve will close. The reject flow rate should be at the 
maximum rate in the rotameter.  

 

6.1.8 

Slowly close in the reject valve and the recycle valve to attain the correct 
operating pressures and reject flow rates*.  

 
The correct operating conditions depend on: 
 

Ž

 Feed 

Temperature 

Ž

  Feed water analysis 

Ž

 Calculated 

recovery 

Ž

 Pre-treatment 

conditions 

 

Caution: Do not start or operate the unit with either the recycle or reject valve closed.  
Severe damage to the membrane and other component may result. 

 

Caution: Do not operate the system at excessive pressures. If over a period:

 

 

Ž

  The permeate conductivity increases by 15% or 

Ž

  The permeate production decrease by 10% or 

Ž

  The HP pump discharge pressure increases by 15%   

 

 
The influent water quality has changed or membranes require periodic cleaning.  Do not increase 
the membrane pressure beyond 115% or permanent damage to the membranes may result. 
When using the unit for the first time, discard the first hour of production to drain. This will rinse 
out any preservative chemical used in membrane storage. 
 

Содержание KRO - 3000

Страница 1: ...dox Street Alexandria NSW 2015 Sydney Australia Prepared by Chatoyer Holdings Pty Ltd ABN 99 080 301 515 www chatoyer com au BRISBANE OFFICE 14 Parkview Street Milton QLD 4064 PO Box 2156 Milton QLD 4064 Tel 07 3367 3866 Fax 07 3367 2886 brisbane chatoyer com au ...

Страница 2: ......

Страница 3: ... 4 2 5 RO Membrane 6 4 2 6 Conductivity Monitor 6 4 2 7 Reject Control Valve 6 4 2 8 Recycle Control valve 7 4 2 9 Flush Solenoid Valve 7 4 2 10 Rotameters 7 4 2 11 Pressure Gauges 7 4 2 12 Low Pressure Switch 7 4 2 13 Float Switch 7 4 2 14 Pressure Reducing Valve 7 5 0 Installation Guide 7 6 0 Description of Operation 8 6 1 Starting Up the Unit 8 6 2 Shutting Down the Unit 9 7 0 Maintenance 9 8 0...

Страница 4: ...ng and possible irreversible damage to the reverse osmosis membrane 2 0 Pre Treatment Rarely in fact almost never is water suitable for direct entry to the membrane housing Table 1 shows a number of contaminants present in raw water capable of causing a permanent damage to the membranes Please note these are the main contaminants However other salts or metals may be encountered and would require a...

Страница 5: ...anual is applicable for model KRO3000 3 0 System Configuration 3 1 The KRO3000 is completed with the following items RO membrane and Stainless Steel membrane Housing Stainless Steel frame Carbon 5 Micron 1 Micron cartridge filters Horizontal Booster Pump Low pressure protection switch Solenoid valve Permeate Reject and Recycle Rotameters Digital controller CM 230 Conductivity meter Feed water pres...

Страница 6: ...mit the flow of raw water into the system Every time the valve opens closes the system will start stop automatically A Flush solenoid valve is also provided with the unit This valve is under the control of a timer Periodically the valve opens to flush the membrane at low pressure This extends the periods between membrane cleans 4 2 System Components 4 2 1 Water Softener The water is Hard when Calc...

Страница 7: ... membrane can work under the conditions of normal pressure and seal arrangement Caution The operator should apply silicon grease on the Y type plastic ring in order to ensure proper sealing of the membrane brine seal 4 2 5 RO Membrane RO membrane is the key component of the RO main unit and has a determinative effect on the quantity and quality of water produced The RO membrane utilizes pressure e...

Страница 8: ...n with the controller shuts down the unit in the event of low feed pressure 4 2 13 Float Switch A facility is provided to connect an external float switch in the permeate storage tank When the circuit is broken between the HIGH LEVEL contacts no volt the unit automatically stops The unit will remain on standby until the level in the tank drops remaking the circuit 4 2 14 Pressure Reducing Valve PR...

Страница 9: ...t flow rate will not be visible in the reject rotameter 6 1 7 After a few minutes the flush valve will close The reject flow rate should be at the maximum rate in the rotameter 6 1 8 Slowly close in the reject valve and the recycle valve to attain the correct operating pressures and reject flow rates The correct operating conditions depend on Feed Temperature Feed water analysis Calculated recover...

Страница 10: ...embrane fouling will occur if the unit is idle for long periods 7 0 Maintenance 7 1 The membranes should be cleaned about every six months or whenever performance diminishes as set out above 7 2 Please consult your supplier to arrange cleaning of the membrane s 7 3 The filter cartridge should be replaced every four months as minimum 7 4 Additional pre treatment should be serviced in accordance wit...

Страница 11: ...on Reset check current setting Allow to cool HP Pump starts but water Pressure low Flush Valve Open Recycle valve fully open Reject valve fully open Pump fault Pump cavitation Wait until flush cycle completes Close valve in Close valve in Inspect pump Bleed air from pump HP Pump starts but Trips Motor Overload Check motor and pump Check overload setting Check controller Excessive Membrane Pressure...

Страница 12: ... the surface of the brine tank 4 Keep record of the last change of filters 5 If a problem is identified please refer to the Trouble Shooting section Section 8 0 or call your supplier of the unit Caution THE SALT USED FOR REGENERATION OF THE WATER SOFTENER MUST BE CROWN HG WATER SOFTENER SALT NO OTHER SALT CAN BE USE FOR REGENERATION 10 0 Expected Values Table 5 shows the expected flow rates and pr...

Страница 13: ...Operation Manual KRO3000 Rev 2 12 Appendices ...

Страница 14: ...Operation Manual KRO3000 Rev 2 13 Appendix I ...

Страница 15: ...Operation Manual KRO3000 Rev 2 14 Appendix II ...

Страница 16: ...Operation Manual KRO3000 Rev 2 15 Appendix III ...

Страница 17: ...Softener Filter Water Control System Installation Operation and Maintenance Manual Autotrol Performa Cv This system installed by ...

Страница 18: ...e O D 1 050 inches 27 mm Distributor Tube Length 1 2 1 2 inches 13 mm 13 mm above top of tank Operating Valve Body Glass Filled Noryl Rubber Components Compounded for cold water Weight Valve with Control 4 5 lbs 2 0 kg Transformer Output 12 VAC 400 mA 4 6 vA Transformer Input 115V 50 60 Hz 230V 50 60 Hz 100 V 50 60 Hz Operating Pressure 20 to 120 psi 1 37 to 8 27 bar Canada 20 to 100 psi 1 37 to 6...

Страница 19: ...male Brine Line 3 8 inch NPT male Distributor Tube O D 1 050 inches 27 mm Distributor Tube Length 1 2 1 2 inches 13 mm 13 mm above top of tank Operating Valve Body Glass filled Noryl Rubber Components Compounded for cold water Weight Valve with Control 4 5 lbs 2 0 kg Transformer Output 12VAC 400 mA 4 6 vA Transformer Input 115V 50 60 Hz 230V 50 60 Hz 100V 50 60 Hz Operating Pressure 10 to 120 psi ...

Страница 20: ...cid fumes 7 The use of resin cleaners in an unvented enclosure is not recommended Water Line Connection The installation of a bypass valve system is recommended to provide for occasions when the water conditioner must be bypassed for hard water or for servicing The most common bypass systems are the Autotrol Series 1265 bypass valve Figure 1 1 and plumbed in globe valves Figure 1 2 Though both are...

Страница 21: ...NK OVERFLOW will direct overflow to the drain instead of spilling on the floor where it could cause considerable damage This fitting should be on the side of the cabinet or brine tank To connect overflow locate hole on side of brine tank Insert overflow fitting not supplied into tank and tighten with plastic thumb nut and gasket as shown Figure 1 4 Attach length of 1 2 inch 1 3 cm I D tubing not s...

Страница 22: ...tting Press the SET button The numbers stop flashing and the control accepts the new setting After approximately 30 seconds the control starts alternating the display between Time of Day and Capacity Note If a beep sounds the new setting is not accepted because it was outside the allowable range The old value will be displayed Day of Week Time of Day Press the SET button The display will show the ...

Страница 23: ...is allowed Table 2 1 Level I Programming Performa Cv 962 Parallel Multi Tank or Single Tank Softener Parameter Range of Values Minimum Increments Factory Value Units of Measure Notes Name Description P1 Time of Week and Time of day 1 7 1 00 to 12 59 AM or PM Metric 1 7 00 00 to 23 59 1 day 1 minute None Hour minute Range depends on value selected for P13 For day of week SUN 1 MON 2 TUE 3 WED 4 THU...

Страница 24: ...tank P7 Brine draw rate 2 200 1 Selected from Table 2 2 This number tells the controller the draw rate based on the injector size The swell time in the draw position is then calculated P9 Backwash time 4 60 1 14 Minutes May be adjusted for application P10 Slow Rinse time 7 125 1 40 Minutes May be adjusted for application This time does not include the calculated brine draw time P11 Fast Rinse time...

Отзывы: