
IOLINK-130
Installation & Applications Guide —
D.1
A
PPENDIX
D
S
ERVICING
I
NFORMATION
Opening of the case is only to be performed
by qualified service personnel.
WARNING !
Before servicing ensure that appliance coupler is
disconnected.
Always disconnect the power cord from the rear panel of
the bridge/router.
Geraetesteckvorrichtung trennen vor den Wartung.
Opening the case
1)
Remove power from the bridge/router and remove the other
cabling.
2)
Turn the bridge/router over and place it on a flat, cushioned
surface.
3)
Remove the two Phillips head screws that fasten the case
together.
4)
Hold the two halves of the case together and turn the
bridge/router right side up.
5)
Lift off the top half of the case.
Содержание IOLINK-130
Страница 10: ... ...
Страница 62: ...Applications 2 40 IOLINK 130 Installation Applications Guide ...
Страница 72: ... ...
Страница 86: ...Octet Locations on Ethernet Frames C 6 IOLINK 130 Installation Applications Guide ...
Страница 104: ...Servicing Information D 18 IOLINK 130 Installation Applications Guide ...
Страница 110: ...E6 IOLINK 130 Installation Applications Guide ...