
FB100
450
132.5
109
621
124
140
190
8
BACK VIEW
194
606
SIDE VIEW
130
98.5
8
TOP VIEW
Internal Dia
FB200
621
211
450
130
124
132.5
8
165
131
155
9
TOP VIEW
237
606
BACK VIEW
SIDE VIEW
Internal Diameter
FB300
450
621
160
250
132.5
8
193.7
124
146
183.7
12
TOP VIEW
606
BACK VIEW
271
SIDE VIEW
Internal Diameter
COMMISSIONING
On completion of the installation and after allowing a suitable period
of time for the fire cement and mortar to dry out, light the stove and
check to ensure that smoke and fumes are taken from the appliance
up the chimney and emitted safely. Also check all joints and seals for
soundness.
Adjust the central heating pump (if fitted) to give the correct water
flow against the circuit resistance and balance the system correctly.
On completion of the installation and commissioning please leave the
operating instructions with the customer and advise on the use of the
appliance and any controls on the system.
®
INSTALLATION INSTRUCTIONS
9
charnwood
Содержание FB100
Страница 1: ...Operating Installation Instructions charnwood FB100 FB200 FB300 ...
Страница 2: ......