
PRE LIGHTING CHECK
C O M M I S S I O N I N G
Ensure that the throat plate is fitted in the roof of the appliance.The
location and positioning of the throat plate is shown in Fig.3. Before
initial lighting check that the front fence is fitted correctly and that the
doors tighten properly. If the multi-fuel grate has been fitted, check
that it operates correctly.
On completion of the installation and after allowing a suitable period
of time for the fire cement and mortar to dry out, make a layer of
ash or sand on the base of the stove before lighting it and checking to
ensure that smoke and fumes are taken from the appliance up the
chimney and emitted safely. Also check all joints and seals. On
completion of the installation and commissioning please leave the
operating instructions with the customer and advise them on the use
of the appliance.
10
®
INSTALLATION INSTRUCTIONS
Fig. 9. Flue Blanking Plate.
Blanking Plate
Blanking Plate
Clamping Plate
with fold horizontal
Back of the Stove
Clamping plate finishes
flush with inside face of
firebox top and bottom.
with fire cement
Seal Blanking Plate
charnwood
Содержание Country 12
Страница 1: ...Operating Installation Instructions charnwood ...
Страница 2: ......