background image

 

 

 

26 

LT5049 (ISS 2) 

REPLACEMENT OF INJECTOR 

1.

 

Repeat operations 1-10 for removal of gas control and spark generator 

2.

 

Repeat operation 2 for removal of burner and or silencer. 

3.

 

Disconnect gas connection to injector and gas control. 

4.

 

Unscrew the locking nut fixing injector to mounting bracket.  

5.

 

Clean or replace as necessary. 

6.

 

Re-assemble in reverse order. 

7.

 

Turn on gas supply, check for gas soundness and recommission appliance. 

REPLACEMENT OF OXY-PILOT ASSEMBLY 

NOTE: If the pilot assembly is replaced it must be replaced by an identical unit from the same manufacturer and replaced as a complete unit. 

1.

 

Repeat operations 1-10 for removal of gas control and spark generator. 

2.

 

Disconnect the thermocouple from the gas control tap. 

3.

 

Disconnect the gas connection from the pilot assembly. 

4.

 

Remove ignitor lead from pilot assembly. 

5.

 

Undo the two screws securing the oxy-pilot to the burner. 

6.

 

Re-assemble in the reverse order. 

7.

 

Turn on the gas supply, check for gas soundness and re-commission appliance. 

 

Replacement of battery 

 

1.

 

Remove fret from in front of the fire 

2.

 

Slide battery not of the spark generator  

3.

 

Pull battery connection terminal away from battery (careful not to damage the connection terminal on the 
lead) 

4.

 

Attach new battery to the terminal on the lead  

5.

 

Slide battery in to the spark generator ensuring its all the way in so it can’t fall out and the hook is over the 
top of the battery  

6.

 

Replace the fret back in front of the fire 

            

 

 

 

 

Careful when removing and attaching this 
connection not to damage the terminal  

Ensure battery is located properly so this 
hook hold the battery in place  

Содержание PARAGON 2000 Plus Low Lintel SLIDE CONTROL

Страница 1: ...isbookletforservicelogandfuturereference For use in Great Britain and Ireland Literature NO 5049 ISS 2 IMPORTANT This appliance is guaranteed for 12 months subject to conditions The 5 year extended parts warranty will only be valid if the annual service recommended in this manual has been completed and appliance has been registered online ...

Страница 2: ...ed in the appropriate checklist This in no way reduces your statutory rights Your warranty commences from the date of purchase and you must retain your receipt or invoice as proof of a purchase date THIS EXTENDED WARRANTY SPECIFICALLY EXCLUDES GLASS AND SOFT REFRACTORY COMPONENTS THE BULB AND ANY BATTERIES Terms and Conditions 1 The appliance must be installed by a GAS SAFE registered person 2 The...

Страница 3: ...lations England and Wales All installations must be notified to Local Area Building Control either directly or through a Competent Persons Scheme A Building Regulations Compliance Certificate will then be issued to the customer who should on receipt write the Notification Number on the Benchmark Checklist This product should be serviced regularly to optimise its safety efficiency and performance T...

Страница 4: ...u record the following details here and keep the receipt as proof of purchase This information may be asked for when you contact the helpdesk MODEL 2000 Plus S C Serial No This information can be found on the label attached to the packaging and on the data badge which is located on the base of the appliance behind the control cover Retailer Name Address Date Of Purchase ...

Страница 5: ... cleaning the fuel bed or cleaning after servicing installation it is recommended that it be of the type fitted with a HEPA filter Disposal of refractory ceramic materials To keep dust to a minimum these materials should be securely wrapped in polythene and be clearly labelled RCF waste These materials are not classified as hazardous waste and should be disposed of at a site licensed for the dispo...

Страница 6: ...structions The full lighting procedure is as follows A Push slide control lever down as far as possible a clicking noise will be heard and the pilot will light HOLD DOWN FIRMLY FOR ABOUT 20 SECONDS B Pull lever up and the pilot light should remain alight and the main burner should light on its low setting C Should the pilot fail to light pull the lever fully up to turn off the appliance wait 3 min...

Страница 7: ... deposits A vacuum cleaner may only be used after the loose components and moulded shapes have been removed CARE SHOULD BE TAKEN TO AVOID CONTACT WITH THE REFRACTORY LINING THIS IS A DELICATE SURFACE AND SHOULD NOT BE WIPED OR RUBBED FUEL BED LAYOUT COAL OPTION Ensure the BASE MATRIX is in position as shown located against the rear edge of the burner outlet Locate the LEFT HAND and RIGHT HAND FRON...

Страница 8: ...e coal provided consist of 5 off shaped as coal A 9 off shaped as coal B NOTE 1x A shape to be omitted on Low Lintel versions Separate the coal into the two size groups Lay first row of loose coals 4 off B coals and 2 off A coals as shown so they bridge across Lay second row of loose coals 3 off B and 2 off A shapes as shown ...

Страница 9: ...e and 1 off A shape as shown for standard P2000 plus and P2000 plus extra FOR LOW LINTEL VERSIONS SEE BELOW PLEASE NOTE Low Lintel Version Only IMPORTANT INFORMATION Do not lay the middle A Shape on Low Lintel version This shape must not be fitted on the fuel bed layout Only lay the two outer B shapes as shown ...

Страница 10: ...position as shown located against the rear edge of the burner outlet Locate the LEFT HAND and RIGHT HAND FRONT PEBBLES as shown so that they sit on the front rail and lean back against the BASE MATRIX Note it is most important that they are located in their correct positions They are marked on the rear L for LEFT HAND FRONT PEBBLE and R for RIGHT HAND FRONT PEBBLE Pebble identification QTY Heart S...

Страница 11: ...www charltonandjenrick co uk 11 LT5049 ISS 2 Lay one row of pebbles at the front of the fire as shown Lay another row of loose pebbles shown Lay another row of loose pebbles as shown ...

Страница 12: ... Safety Installation and Use Regulations 1998 as amended The chimney or flue should be checked annually to ensure clearance of combustion products Ventilation in the United Kingdom This appliance does not normally require purpose built ventilation but if for any special reason purpose built ventilation is provided it should be checked periodically to ensure freedom from obstruction Ventilation in ...

Страница 13: ...al construction should enable it to stand firmly across the full width of the burner The design of the fire front fret must have a removable ashtray cover lower section The ash tray cover must have cut outs and or holes which provide ventilation to the underside of the burner The effective area of ventilation through the ash tray cover must be greater than 1365mm2 2 12 sq ins ...

Страница 14: ...Size 460 Size 135 Data Label Location Frame of appliance on top RH corner behind trim 2000 Plus Lower L H Flange of Appliance 2000 Plus Lo Lintle Gas Connection 8 mm OD Tube NOTE The efficiency of this appliance has been measured as specified in BS7977 1 2009 and the result is 55 6 The gross calorific value of the fuel has been used for this efficiency calculation GASTEC have certified the test da...

Страница 15: ...onal brick or stone chimney A pre cast flue conforming to BS 1289 Pt 1 or Pt 2 A metal flue and box conforming to BS 715 further details are covered in later text A non combustible hearth must be provided to comply with the building regulations or a suitable proprietary fire surround with a 100 degrees C rating During initial firing an odour may be evident This is the binder used during the manufa...

Страница 16: ...cable fixing system used The opening depth must be a minimum of 215 mm to allow sufficient volume for debris collection this depth may be reduced to 185 mm if the chimney is new or has never been used for solid fuel or oil before To obtain this depth it may be necessary to remove the chairbrick Note spacers are available in 20mm and 43mm to further reduce the opening depth if required if a spacer ...

Страница 17: ... directly bonded to the flue blocks but there is a risk of surface cracking occurring to the plaster above the appliance CLASS TWO FABRICATED METAL A double walled or insulated metal flue box built to the requirements of BS 715 with an insulated flue having a minimum diameter of 125 mm 5 ins and a minimum effective overall height of 3 metres 10 ft IMPORTANT the flue restrictor plate must not be fi...

Страница 18: ...s is to ensure that no flame or incandescent material is less than 225mm above the floor a requirement of approved document J Where this is the case a means must be provided to support the fret this may typically be meet with a small projecting hearth of minimum 100mm Unless the fret is fixed to the appliance or is an integral part of the fascia of the appliance Consideration should be given to th...

Страница 19: ...e VENTILATION In the United Kingdom no special ventilation bricks or vents are required into the room containing the appliance provided normal adventitious room ventilation exists The installer must satisfy this point by carrying out a mandatory spillage test In the Republic of Ireland permanent ventilation must comply with the rules in force SECTION NINE To Install the Appliance installation inst...

Страница 20: ...the end as shown above Ensure the spindle is pushed back inside the control valve as far as possible Ensure the bell crank mechanism is swung up to give easy access to the gas connection point as shown Cut a cross slit in the rubber grommet and feed the appliance onto the 8mm gas supply pipe Position the restrictor elbow supplied and mark supply pipe at its cut off length Remove appliance cut pipe...

Страница 21: ...IR TIGHT SEAL WHEN THE APPLIANCE IS FITTED NOTE DO NOT USE PERMANENT SEALING COMPOUNDS i e SILICON SEALANT THIS COULD CAUSE THE APPLIANCE TO BE DAMAGED WHEN IT IS REMOVED FOR SERVICING AND COULD INVALIDATE THE WARRANTY If the spacer is not being used mark position of flange hole in the fireplace front drill and fix firebox in position with wall plugs and wood screws If spacer is being used fix the...

Страница 22: ... to the appliance check for gas soundness in accordance with current codes of practice CONNECTING CONTROL LEVER TENSIONING NUT CLAMP SCREW Flip the slide control lever round so that the rubber capped end is protruding out to the right as shown in the left hand picture Check that it slides freely up and down in the nylon slide guides Remove the nylock nut with a 7mm A F spanner as shown Connect the...

Страница 23: ...s and windows and leave fire burning for 5 minutes Then position a smoke match just into the top of the fire opening and move it left and right all the smoke must be drawn into the flue If spillage occurs allow a further 5 minutes Should spillage still occur remove appliance restrictor plate if still fitted and repeat spillage test If spillage still occurs turn off the fire and seek expert advice ...

Страница 24: ...Regulations 1998 as amended this should ensure the safe and correct operation of the appliance Before commencing any service or replacement of parts turn off the gas supply to the fire After servicing check for gas soundness When ordering spare parts please quote appliance name and serial number these can be found on the data badge which is located by removing the decorative fire trim At least onc...

Страница 25: ...ol 12 Remove the spark generator by removing the battery cap battery and remove the generator by loosening its bezel nut 13 Disconnect the three compression gas connections from the gas control 14 Undo the thermocouple connection from the rear of the gas control tap 15 Undo the screw in the centre of the gas control spindle and remove from linkage 16 Undo and remove the two screws securing the gas...

Страница 26: ...ple from the gas control tap 3 Disconnect the gas connection from the pilot assembly 4 Remove ignitor lead from pilot assembly 5 Undo the two screws securing the oxy pilot to the burner 6 Re assemble in the reverse order 7 Turn on the gas supply check for gas soundness and re commission appliance Replacement of battery 1 Remove fret from in front of the fire 2 Slide battery not of the spark genera...

Страница 27: ...www charltonandjenrick co uk 27 LT5049 ISS 2 ...

Страница 28: ...28 LT5049 ISS 2 ...

Страница 29: ...www charltonandjenrick co uk 29 LT5049 ISS 2 Register your appliance online today to active your warranty ...

Страница 30: ...facturer s instructions Hearth Requirements where fitted Is the hearth constructed from non combustible material Is the hearth a minimum of 12mm thick with a minimum floor to top surface of 50mm BS5871 or as per manufacturer s instructions Is the hearth for open fronted fires a minimum of 760mm wide and has 300mm projecting from the fire opening BS6871 or to manufacturer s instructions Mounting he...

Страница 31: ...ays use the manufacturer s specified spare part when replacing controls SERVICE 01 Date Engineer name Company name Telephone No Gas safe register No Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Gas safe register No Comments Signature SERVICE 03 Date Engineer name Company name Telephone No Gas safe register No Comments Signature SERVICE 04 Date Engineer name Company na...

Страница 32: ...LPG Burner Tray Box Assembly Ceramics Set Part no 5568 Fixing Kit 0705 eye bolt foam strip screw magnets wall plug Qty 4 Qty 1 Qty 4 Qty 4 Qty 4 Magnets Special Qty 4 Owners Book Restrictor Elbow Battery 9v Trim Edge Covers 1 x White 1 x Black Warning Label Serial Number Inspector ...

Отзывы: