Charles Fiber Pedlock BDO2 Series Скачать руководство пользователя страница 21

 

LT-BDO20X-801 

 

 

3

rd

 Printing 

Page 21 of 22 

 

3.4.8.

 

Splicing Fibers at the BDO2 Pedestal 

Step 

Number 

Description 

Prepare to splice fibers and review cautions and warning listed before at the beginning of this document. 

After removing the outer dome, loosen the Velcro 

straps and remove the tray from the organizer. 
Detach the cover by pulling up on the two cover 
holes. 

 

Perform splicing per company practice and coil/wrap the fibers following the tray manufacturer’s recommended procedures.   

Note: First install the spliced fibers and then the expressed fibers. This will permit access to the fibers that were not spl iced for 

future additions, rework or test without disturbing the working fibers. 

Per company practice, install the tray label and identify the splices. To replace the cover, first insert it under the tabs o n one side 

of the tray. Then flex the tray using one of the holes in the cover, and slide the cover under the remaining tabs. Perform this at 
both ends.  

Note: Do not push the splice tray cover on top of the tabs, as the tabs may bend. If a tab becomes bent, it can be straighten ed 

with a small screw driver or l

ineman’s knife. 

Coil all buffer tube slack attached to the tray into the basket. Rest the tray against the tabs on the edge of the basket and  secure 

the tray with the supplied Velcro straps. 

To allow proper dome placement, verify all cabling/tubing is neat and not kinked and verify no cables, cable ties, or tubes 

protrude beyond the fiber organizer walls. 

Lower the dome and rotate it so that the lock lines up with the base latch. Push down on the dome to activate the locking 

mechanism. Verify that the dome is securely attached by pulling up on it after the latch clicks into position.  

 

 

 

 

Содержание Fiber Pedlock BDO2 Series

Страница 1: ...t mid span or stub in point BDO2 pedestals protect against floods fire dirt weather insects and impact The bottom section of the pedestal is a locking two piece split square base featuring expanded capacity This design allows the base to be taken apart and installed around conduit fed cable bundles in new replacement construction to accept less flexible cables or to facilitate the repair rehab of ...

Страница 2: ...aining live circuits If eyes are exposed to laser light or radiation occurs immediately seek treatment by a medical professional WARNING Cable and fiber cleaning solvents may contain hazardous or harmful materials Maintain good housekeeping practices and refer to the SDS when working with cleaning solvents or similar products Shards and cleaved glass fibers are very sharp and can easily pierce the...

Страница 3: ...LT BDO20X 801 3rd Printing Page 3 of 22 Figure 2 BDO203 EG Figure 3 BDO204 EG Figure 4 BDO205 EG ...

Страница 4: ...LT BDO20X 801 Page 4 of 22 3rd Printing Figure 5 BDO203 EGxx Figure 6 BDO204 EGxx Figure 7 BDO205 EGxx ...

Страница 5: ...LT BDO20X 801 3rd Printing Page 5 of 22 Figure 8 BDO203 Exx Figure 9 BDO204 Exx Figure 10 BDO205 Exx ...

Страница 6: ...LT BDO20X 801 Page 6 of 22 3rd Printing Figure 11 BDO203 ExxO Figure 12 BDO204 ExxO Figure 13 BDO205 ExxO ...

Страница 7: ...sure Bag of parts provided with the pedestal Wrenches or socket set Proper lengths of drop cables Labels for cables Splice tray tray labels optional Assorted cable ties 3 4 Mounting the BDO2 The steps in this section help the cable technician perform all final fiber feed and drop cable preparations routing attachments connections and splicing and presume the following conditions Cable Architecture...

Страница 8: ...t aside until installation is complete 3 Verify that the clear plastic bag typically attached to the fiber organizer contains the following Document 2 bond straps 2 hose clamps 1 tray optional 4 Should it be necessary to remove the organizer for cable sheath marking or earth ground attachment first push in the release tab on one leg then pull up slightly on this leg Second push the release tab on ...

Страница 9: ...ny practice when grounding cables equipment 4 Remove approximately 12 of cable sheathing from the center of the 15 cable loop for fiber routing storage and splicing with sufficient sheathing Note Provided the cable is of small enough diameter it can be shaped into a short S curve prior to the placement of the cut mark in order to provide slack in case settling occurs Pushing cable into the conduit...

Страница 10: ...nizer 12 If the cable has strength members that were not terminated in an optional cable bond clamp Step 10 loosen the bolt in the clamp at the top of the cable attachment unit Trim the strength members to fit between the two washers under the top bolt See illustration Tighten the hex bolt Provided that the procedures shown in Step 9 for the sheathing removal were followed the sheathing should be ...

Страница 11: ... basket Place the cable ties at regular intervals around the basket Coil the tubes around the basket approx 3 loops and secure the bundle to the outside of the basket If the expressed fiber bundle or tail is ribbon fiber ribbon clips are provided to secure the ribbon to the fiber organizer Install eight 8 ribbon clips into the counter bored holes around the basket on the CO side of the organizer N...

Страница 12: ...icing operations Hold the tubes to the corner of the tray and mark the tube for removal at a point 1 inch inward of the buffer tube tie down slots Note 12 feet of exposed buffer tube nominally provide 24 inches of slack tube to the tray and 25 30 inches of slack fiber inside the tray for splicing 4 Using company approved or local procedures score and slit the tube at the marks and remove the buffe...

Страница 13: ...bbon stubbed end If using 900µm fiber pigtails or ribbon fiber fanout proceed to Step 6 2 If using 900µm jacketed pigtails proceed to Section 3 4 5 For 2 3mm pigtails proceed to next step 3 To ensure efficient fiber management when using 2 3mm pigtails connect one pigtail to the CO side of the bulkhead adapter panel and route it into the basket Depending on desired slack coil the pigtail inside th...

Страница 14: ...ls attached to it to reach the splicing equipment Secure the pigtail bundle to the splice tray corner per company practice 7 The 2 3 mm pigtails were connected to the CO side bulkhead in Step 3 and routed to the drop side via the slot at the top of the fiber basket Step 4 Next as shown on the right the pigtails are then looped inside the basket 1 2 times then routed over the lower bend radius cont...

Страница 15: ... basket The transport tube will run alongside and in the same direction as the CO fiber tube Note It may be necessary to trim the transport tube so that only one loop is stored inside the basket The other end of the tube should protrude approximately 6 inches out of the top of the basket 4 Again prepare the splice tray for tube attachment starting two new cable ties in the tray corner at the tie d...

Страница 16: ...or bundle tubes together at short intervals Loop and store the tube group or any 2 3mm pigtails inside the fiber basket rotating the tray to avoid kinking of the buffer tubes For EL0X models hang the last loop over the bend control EG and EB fiber organizers do not have a radius control above the basket ...

Страница 17: ...it fed it is recommended that the optional drop hole cover kit be installed P N 97 DRPHOLCVRKIT In all situations it is important to seal off the drop cable access port with the channel or cover 4 Verify a minimum of 9 feet of drop cable will extend up past the ground line indicator on the base then per local company practice measure and cut the drop cable to the desired length 5 In removing the s...

Страница 18: ... tube s There should be approximately 32 of fiber to be stored in the tray Clean fibers per company practice 14 Per splice tray manufacturer instructions secure the drop buffer tube to the tray Note It is recommended that the installer use the same corner of tray for the feed and drop buffer tubes Attach the drop tube adjacent to the feed cable buffer tubes Using two cable ties attach the drop tub...

Страница 19: ...nst the fiber basket hold the drop cable in place against the cable attachment unit 3 Place the cable at the preferred height and attach it to the cable attachment unit with a cable tie dielectric or a hose clamp armored Follow local practices 4 Secure the cable breakout to the lower inner wall of the basket 5 Loop and hang the pigtail assembly over the bend control then route the connectors to th...

Страница 20: ...LT BDO20X 801 Page 20 of 22 3rd Printing 5a 5b ...

Страница 21: ... splices To replace the cover first insert it under the tabs on one side of the tray Then flex the tray using one of the holes in the cover and slide the cover under the remaining tabs Perform this at both ends Note Do not push the splice tray cover on top of the tabs as the tabs may bend If a tab becomes bent it can be straighten ed with a small screw driver or lineman s knife 5 Coil all buffer t...

Страница 22: ...lar I D Inside Diameter 6 2 in 7 7 in 10 25 in Diameter dome O D not the cap 7 1 in 8 6 in 11 25 in Diameter dome I D 6 7 in 8 2 in 10 88 in Weight 18 lbs 21 lbs 29 lbs Part numbers BDO203 EXX BDO204 EXX and BDO205 EXX have a top bulkhead area 5 2 Ordering Information Part Number Description 97 SCU12LF3M Loose tube fiber fanout w 12 SC UPC connectors 3 m long 97 SCU12RF3M Ribbon fiber fanout w 12 ...

Отзывы: