To facilitate lamp removal, ensure there is enough space at the lamp connector end to safely 

remove the UV lamp and/or quartz sleeve (See Figure 2). The controller will require a ground 

fault circuit interrupter (GFCI or GFI) outlet and should be mounted beside or above the reactor.

PLEASE NOTE: All CHANDLER UV disinfection systems are intended for indoor use only as they 

should not be exposed to the elements.

Installation 

Step 1:   The reactor can be installed either horizontally or 

vertically using the clamps provided. Vertical installation is 

the preferred method with the inlet at the bottom (lamp 

connection at the top) as it allows any air that may be in the 

lines to be easily purged from the system.

Step 2:  The use of a by-pass assembly is recommended as 

it will allow you to isolate the UV reactor. This will allow for 

easier access in case maintenance is required (See Figure 3).

Step 3:  Use the supplied fasteners to mount the UV reac-

tor to wood or drywall. If mounting to an alternate material 

you will need to purchase the proper corresponding fasten-

ers.

Step 4:   For water supplies where the maximum flow rate 

is unknown, a flow restrictor is recommended so that the 

rated flow of your particular CHANDLER system is not ex-

ceeded. The flow restrictor should be installed on the outlet 

port of the reactor.

Step 5:   It  is  recommended  to  have  a  licensed  plumber 

connect the UV reactor to the water supply and may be a 

requirement depending on where you are located. 

     

Figure 3.  By-pass assembly

Figure 2. Lamp Removal 

Spacing

leave at least 

an additonal 

reactor length 

to facilitate 

lamp and 

sleeve removal

Note: Installation of your 

CHANDLER disinfection 

systems shall comply with 

applicable provincial/state & 

local regulations.

Содержание UV-10DH

Страница 1: ...V 5H UV 5DH UV 5DHM 5 gpm UV 3 UV3D UV3DM 3 gpm UV 10H UV 10DH UV 10DHM 10 gpm UV 6 UV6D UV6DM 6 gpm UV 15H UV 15DH UV 15DHM 15 gpm UV 11 UV11D UV11DM 11 gpm UV 25H UV 25DH UV 25DHM 25 gpm UV 15 UV15D...

Страница 2: ...pply with a UV system gives you reassurance that your family will have access to safe drinking water throughout your entire home with no chance of microbiological contamination This is chemical free p...

Страница 3: ...llers 14 Power up Sequence not UV systems 14 UV D UV DH Operational Screens 15 UV DM UV DHM Operational Screens 16 Lamp Countdown Sequence 16 Lamp Replacement UV UVH systems 17 Lamp Replacement UV DM...

Страница 4: ...vice instructions if required 7 Do not use this system for any purpose other than what it was intended for Misuse of this system could potentially cause harm to the user or others 8 Your system is int...

Страница 5: ...required will depend on parameters being treated Hardness 7 gpg 120 mg L if hardness level is 7 gpg or slightly below the quartz sleeve must be cleaned periodically in order to ensure effi cient UV p...

Страница 6: ...an UV D UV DM SYSTEMS UVC 5 North American 300016 Complete Assembly 310026 Teflon Plug 310040 O Ring 390007 Brass Nut UVS 2 5 UVDM 2 3 6 11 15 series UVS 3 5 UVDM 20 series GLAND NUT O RING SLEEVE SPR...

Страница 7: ...nits UV DH UV DHM SYS TEMS UVC 4H fits all units POWER CORD 300016 Complete Assembly 310026 Teflon Plug 310040 O Ring 390007 Brass Nut UVS 3 5H Standard series 260004 North American 320006 310038 UVLM...

Страница 8: ...or tap near est the pressure system and measure the amount of water drawn off until the pump starts again Depending on the size of the container used it is acceptable to turn the faucet on and off to...

Страница 9: ...s it will allow you to isolate the UV reactor This will allow for easier access in case maintenance is required See Figure 3 Step 3 Use the supplied fasteners to mount the UV reac tor to wood or drywa...

Страница 10: ...SE NOTE DO NOT install a UV lamp inside the quartz sleeve without the sleeve spring in place Step 8 Install the UV sensor UVDM systems only Align the flat portion so it faces the gland nut end and mat...

Страница 11: ...ou The key will plug into the lamp key port on the right side of the controller Figure 8 Step 13 Plug the lamp connector into the lamp Note the keying for proper alignment see Fig ure 7a 7b Insert the...

Страница 12: ...eaning At a minimum the quartz sleeve should be cleaned on an annual basis The following steps outline a basic clean ing procedure Step 1 If a by pass assembly is installed shut the inlet valve off to...

Страница 13: ...of the sensor port Step 6 Holding the sensor in your hand wipe the flat portion sensor face of the sensor with isopropyl alcohol using a clean lint free cloth Step 7 Replace sensor following step 9 fr...

Страница 14: ...description of the system s performance in addition to pro viding any applicable fault messages and system diagnos tics The controllers used in both the UVD and UVDM are identical The difference is t...

Страница 15: ...ts screens by pressing the button located on the front of the controller UV DM UV DHM Operational Screens On systems with the UV monitor the system will display the same screens as on the UVD except t...

Страница 16: ...ible chirp Past the zero day threshold the LED or display screen changes to solid red with a continuous buzzer UV D DM UV DH DHM UV UVH At any point during this sequence the audible chirp or alarm can...

Страница 17: ...pired it must be replaced with the same part number as indicated on the Maintenance Parts screen or on the label on the reactor With the system powered down re move and discard the lamp key from the c...

Страница 18: ...on the reactor or on the Maintenance parts screen Low UV Intensity Remove and clean the quartz sleeve and sensor Check water quality meets requirements on page 5 and add filtration as required Replac...

Страница 19: ...to the system Replace any module that is not detected when plugged directly into the controller COMING SOON Warning After any hard alarm the home or facility should be disinfected Follow the steps un...

Страница 20: ...to allow fresh cooler water to enter the system The TRV works with out power and comes complete with 10 of drain line Order PN UV TRV 0 5 for 1 2 ports PN UV TRV 0 75 for 3 4 ports PN UV TRV 1 for 1 p...

Страница 21: ...L1 4 20 mA MODULE Outputs a 4 20mA signal of the UV output to a remote device such as a data logger or computer Order PN UVMOD 420 The WiFi module and accompanying IoT application allows you to connec...

Страница 22: ...9 62 51 Replacement Lamp UVLMP 2 UVLMP 3 UVLMP 6 UVLMP 11 UVLMP 15 UVLMP 20 Replacement Sleeve UVQTZ 2 UVQTZ 3 UVQTZ 6 UVQTZ 11 UVQTZ 15 UVQTZ 20 Reactor Dimensions 6 4 x 26 2 cm 2 5 x 10 3 6 4 x 36 4...

Страница 23: ...0 2 m3 hr 0 5 m3 hr 0 6 m3 hr 1 1 m3 hr 1 8 m3 hr Port Size MNPT MNPT 1 MNPT 1 MNPT 1 MNPT Electrical 90 265V 50 60Hz 1 5A Max Lamp Power Watts 18 34 45 67 101 Power Watts 20 36 48 72 108 Replacement...

Страница 24: ...CHANDLER s closest Distribution Facility or authorized service depot CHANDLER will not be liable for any costs of removal installation transportation or any other charges which may arise in connectio...

Страница 25: ...PRODUCT AND IS GIVEN IN LIEU OF ANY OTHER WARRANTY TO THE EXTENT ALLOWED BY APPLICABLE LAW ANY AND ALL EXPRESS OR IMPLIED WARRANTIES NOT SET FORTH HEREIN ARE WAIVED AND DISCLAIMED INCLUDING ANY IMPLI...

Страница 26: ...2 6 P a g e...

Страница 27: ...2 7 P a g e...

Страница 28: ...Chandler Systems 710 Orange Street Ashland OH 44805 Phone 888 363 9434 www chandlersystemsinc com PN 910181 Version Date 03 2020...

Отзывы: