48
Single Source Gas Booster Piping
s"CLOSE
H
HOT WATER OUT TO MACHINE
FINAL RINSE AND COIL
HOT WATER OUT
TANK HEAT COIL
HOT WATER OUT
TO FINAL RINSE
110° HOT WATER IN TO BOOSTER
AND RETURN FROM TANK HEAT COIL
s"CLOSE
s"CLOSE
OFF
ON
APOLLO
OPT. RIGHT HAND
END FLUE EXHAUST
STANDARD REAR
FLUE EXHAUST
H
H
H
11
13
6
6
7
9
4
23
25
11
11
10
10
12
17
19
20
15
18
17
21
16
2
2
2
2
2
7
4
5
22
14
13
25
26
14
11
13
22
5
1
2
4
24
3
2
OUT
IN
WATER RETURN FROM COIL
HOT WATER IN FROM
BOOSTER TO COIL
HOT WATER RETURN FROM
COIL TO BOOSTER
Содержание D-H1TCM5
Страница 10: ...vi Blank Page This Page Intentionally Left Blank ...
Страница 34: ...24 DHBT DH1T Panels 7 12 10 10 11 11 10 6 1 5 9 6 8 2 3 4 9 9 7 8 ...
Страница 44: ...34 Wash and Rinse Spray Piping FRONT LEFT SIDE 2 1 2 3 7 6 8 7 13 10 8 5 4 5 3 11 10 9 12 ...
Страница 46: ...36 Wash and Rinse Spray Arms 1 1 4 3 3 Beginning with S N D3863 and above 2 2 4 3 3 Prior to S N D3863 6 5 7 8 ...
Страница 48: ...38 Scrap Screens and Drain Assembly 2 3 4 4 5 6 7 10 11 11 13 15 16 14 12 8 8 9 1 17 ...
Страница 62: ...52 DHBT DH1T Upper Fill Piping Assembly 16 9 12 3 11 8 2 6 4 7 5 WATER IN FROM LOWER PIPING 1 13 8 14 10 15 3 ...
Страница 66: ...56 Pump Assembly 1 2 3 7 4 6 5 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 28 27 29 30 31 32 26 ...
Страница 72: ...62 Dish racks PRV 1 2 3 ...
Страница 74: ...64 This Page Intentionally Left Blank Blank Page ...