iii
CONTENTS
CONTENTS
Page
REVISION HISTORY ......................................................................................................................
i
WARRANTY ..................................................................................................................................
vi
KEY COMPONENTS ......................................................................................................................
1
INTRODUCTION ..........................................................................................................................
2
GENERAL........................................................................................................................................
3
INSTALLATION ............................................................................................................................
5
Unpacking ..........................................................................................................................
5
Electrical Connections ........................................................................................................
5
Plumbing Connections ........................................................................................................
6
Ventilation Connections ......................................................................................................
6
Chemical Connections ........................................................................................................
6
Curtain Locations ................................................................................................................
7
Completing Installation ......................................................................................................
7
OPERATION ....................................................................................................................................
8
MAINTENANCE ............................................................................................................................ 11
Maintenance Schedule ........................................................................................................ 11
Deliming .............................................................................................................................. 12
TROUBLESHOOTING .................................................................................................................. 13
ELECTRICAL SERVICE ................................................................................................................ 15
MECHANICAL SERVICE .............................................................................................................. 23
TABLE LIMIT SWITCH INSTALLATION .................................................................................... 27
REPLACEMENT PARTS ................................................................................................................ 31
ELECTRICAL SCHEMATICS ...................................................................................................... 171
LIST OF FIGURES
Figure
1 — Fuse Blocks .............................................................................................................. 15
Figure
2 — Motor Overload ...................................................................................................... 15
Figure
3 — Pump Timer .............................................................................................................. 16
Figure
4 — Dual Float Switch .................................................................................................... 17
Figure
5 — Tank Heat Thermostats ............................................................................................ 18
Figure
6 — Booster Thermostat Locations (Electric) ................................................................ 18
Figure
7 — Booster High Limit Thermostat (Electric) .............................................................. 18
Figure
8 — Front View Typical 40°F/22°C rise Booster, One Tank 38 Kw shown .................. 22
Figure
9 — Front View Typical 70°F/39°C rise Booster, Two Tank 63 Kw shown .................... 22
Figure 10 — Idle Pump Switch Assembly .................................................................................... 24
Содержание 44 WS
Страница 12: ...4 This Page Intentionally Left Blank GENERAL ...
Страница 39: ...31 REPLACEMENT PARTS REPLACEMENT PARTS ...
Страница 79: ...71 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 83: ...75 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...79 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 91: ...83 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 95: ...87 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 117: ...109 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 121: ...113 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 125: ...117 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 145: ...137 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 149: ...141 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 153: ...145 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 174: ...166 Figure 73 Vent Hood Assembly REPLACEMENT PARTS Cham pion 8 9 7 11 2 2 5 5 2 2 3 6 4 4 10 1 1R077 ...
Страница 176: ...168 Figure 74 Dish Racks REPLACEMENT PARTS 1 2 1R078 ...
Страница 178: ...170 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 179: ...171 ELECTRICAL SCHEMATICS ...