
100740 - PARALLEL KiT
CAbLE STORAGE
10
NOTiCE
This unit should NOT be used to connect inverters with
non-ParaLINK receptacles such as the style shown below:
Adjusting the Anti-Vibration Wedges
There are two rubber wedges on the bottom of the parallel kit that
can be removed or moved to create a friction fit wedge between
the parallel kit and inverter. If, after tightening the fastener dial,
your parallel kit is vibrating during operation slide the wedges
toward the back of the parallel kit until snug to reduce vibration.
CAbLE STORAGE
When not in use, neatly wrap the cables and use the spring loaded
clips on top of the parallel kit to hold the cables in place.