background image

33

Code

Meaning

Solution

Saved

69

Wireless edge triggered

IF an obstruction occurred, no action required. If an obstruction did NOT
occur, check inputs and wiring.

NO

70

CLOSE EYE/INTERRUPT triggered, causing
reversal, preventing close, or resetting TTC

IF an obstruction occurred, no action required. If an obstruction did NOT
occur, check alignment, inputs, and wiring on main control board

NO

71

CLOSE EDGE triggered, causing reversal, NO
preventing close, or canceling TTC

72

OPEN EYE/EDGE triggered, causing reversal or
preventing opening

73

CLOSE EYE/INTERRUPT triggered, causing
reversal, preventing close, or resetting TTC

IF an obstruction occurred, no action required. If an obstruction did NOT
occur, check alignment, inputs, and wiring on expansion board.

NO

74

CLOSE EYE/EDGE triggered, causing reversal and
preventing close or canceling TTC

75

OPEN EYE/EDGE triggered, causing reversal or
preventing opening

80

Close input (EYE/EDGE) communication fault from
other operator

Check inputs and communication method between operators, either wired
bus or radio. Ensure operator is powered. May have to erase the wireless
communication and reprogram the two operators.

YES

81

Open input (EYE/EDGE) communication fault from
other operator

82

Close input (EYE/EDGE) communication fault
(expansion board)

Check the connections between the main board and the expansion board.

YES

83

Open input (EYE/EDGE) communication fault
(expansion board)

84

Non-monitored device detected on the wireless
safety system

Non-monitored contact closure devices are not supported. Make sure
connected devices are monitored. Check edges for proper orientation and
resistive end cap connection.

YES

91

Force Reversal (Operator 1)

Check for obstruction. If no obstruction, check that the mechanical
assembly is engaged and free to move. See section on Limit and Force
Adjustment, and Obstruction Test.

YES

93

RPM / STALL Reversal (Operator 1)

Check for obstruction. If no obstruction, check the operator wiring and
that the mechanical assembly is engaged and free to move. Replace APE
assembly.

YES

99

Normal Operation

No action required

YES

TROUBLESHOOTING

Содержание RSL12UL

Страница 1: ...and not intended for use on pedestrian passage gates This model is intended for use in Class I and II vehicular slide gate applications Visit LiftMaster com to locate a professional installing dealer...

Страница 2: ...HOOTING 31 Diagnostic Codes 31 Diagnostic Codes Table 32 Control Board LEDs 34 Troubleshooting Chart 35 APPENDIX 37 Dual gate settings 37 Step 6 Solar Panel s 38 Limit setup with a remote control 42 W...

Страница 3: ...ment protection devices in each entrapment zone l This vehicular slide gate operator will operate only after installation of a minimum of two independent monitored entrapment protection devices in eac...

Страница 4: ...d and work freely in both directions prior to the installation of the gate operator 8 Permanently mounted access controls intended for users to activate must be located at least 6 feet 1 8 m away from...

Страница 5: ...existing gate shall be upgraded to conform to the provisions of this specification 2 4 When the gate of an automated gate system requires replacement the new gate shall conform to the provisions of t...

Страница 6: ...6 Carton Inventory NOT SHOWN Documentation Packet Chain 41 30 feet Eye Bolt Kit INTRODUCTION...

Страница 7: ...24 m Maximum Gate Travel Speed 12 inches second Maximum Daily Cycle Rate 120 cycles day Maximum Duty Cycle Continuous Operating Temperature Without Heater 20 C to 60 C 4 F to 140 F With Optional Heate...

Страница 8: ...your gate application Install a warning sign two provided on the inside and outside of the property where easily visible Gate Gate must be constructed and installed according to ASTM F2200 standards...

Страница 9: ...derground utility locating companies BEFORE digging more than 18 inches 46 cm deep l ALWAYS wear protective gloves and eye protection when changing the battery or working around the battery compartmen...

Страница 10: ...e front roller of the gate Lay out the concrete pad 2 Install the electrical conduit 3 Pour a concrete pad reinforced concrete is recommended Rear Installation 1 The gate operator should be installed...

Страница 11: ...crete pad with appropriate fasteners The gate operator should be installed near the front roller of the gate or near the back of the gate in the OPEN position The space between the gate and the output...

Страница 12: ...ain length Rear Installation DO NOT run the operator until instructed NOTE This installation will require two extra idler pulleys Make sure all exposed pinch points are guarded Refer to Gate Construct...

Страница 13: ...stallation is unique It is the responsibility of the installer to ensure that ALL entrapment zones are protected with an external monitored entrapment protection device protecting both the open and cl...

Страница 14: ...ensor entrapment protection for the close direction When an obstruction is sensed during gate closing the gate will reverse to the full open position disengaging the Timer to Close This input will be...

Страница 15: ...NOTE The operator should be on a separate fused line of adequate capacity l ALL electrical connections MUST be made by a qualified individual l DO NOT install ANY wiring or attempt to run the operato...

Страница 16: ...rod can be grounded to the chassis 7 Connect the white wire to NEUTRAL using a wire nut 8 Connect the black wire to HOT using a wire nut 9 Replace the junction box cover Ensure the wires are not pinc...

Страница 17: ...pplication requires the 33AH wire harness Model K94 37236 1 Unplug the transformer 2 Unplug the J15 plug labeled BATT on the control board by squeezing the plug and pulling it from the control board T...

Страница 18: ...ARN button again on the primary operator The yellow NETWORK LED will light 4 Press and release the OPEN test button to assign this operator as network primary 5 Press and release the LEARN button on t...

Страница 19: ...he chassis ground of one operator 6 Connect ALL power to the operator and plug the J15 plug into the control board DUAL GATE WIRE TYPE SHIELDED TWISTED PAIR CABLE 22AWG up to 200 feet 61 m 18AWG 200 1...

Страница 20: ...Cover 1 Slide the cover over the operator 2 Align the hole in the cover with the threaded hole in the operator s chassis and secure the cover with the provided 5 16 18 screw The basic installation is...

Страница 21: ...d below or a remote control refer to Limit Setup with a Remote Control in the Appendix Setting the limits with a remote control requires a 3 button remote control programmed to OPEN CLOSE and STOP NOT...

Страница 22: ...n be adjusted independently from the other by following steps 1 3 of the Initial Limit and Force Adjustment section Obstruction Test The operator is equipped with an inherent built in to the operator...

Страница 23: ...TER LED will go out if programming is successful To program additional Security 2 0 remote controls or remote control buttons repeat the programming steps above Entering programming mode using externa...

Страница 24: ...ns simultaneously 5 seconds until both the SET OPEN and SET CLOSE LEDs blink rapidly and the operator beeps 2 Release the buttons and the SET OPEN and SET CLOSE LEDs will blink slowly indicating the l...

Страница 25: ...TC dial can be set to automatically close the gate after a specified time period The TTC is factory set to OFF If the TTC is set to the OFF position then the gate will remain open until the operator r...

Страница 26: ...secutively the alarm will sound up to 5 minutes and the operator will need to be reset A The gate is hitting a wall or vehicle B The gate does not meet specifications C Debris is on the gate s track s...

Страница 27: ...holds open an open gate if maintained pauses Timer to Close at OPEN limit SHADOW 2 Terminals This input is used for external shadow loop detector when loop is positioned under the swing of the gate l...

Страница 28: ...s and resets alarm condition within line of sight l STOP and COM Stops a moving gate Hard stop maintained switch overrides Open and Close commands and resets alarm condition If maintained pauses Timer...

Страница 29: ...properly adjusted and there are no obstructions to gate travel l To reduce the risk of FIRE or INJURY to persons use ONLY LiftMaster part 29 NP712 for replacement batteries l SAVE THESE INSTRUCTIONS...

Страница 30: ...rt 29 NP712 for replacement batteries The batteries contain lead and need to be disposed of properly The operator comes with one 7AH battery One 33AH Battery A12330SGLPK with 33AH Battery Harness K94...

Страница 31: ...show the code sequence number followed by the code number To Scroll Through the Saved Codes The operator will only keep track of up to 20 codes then will start saving over the oldest codes as new code...

Страница 32: ...r less than 10V on a 12V system Make sure there is NOT a single 12V battery on a 24V system YES 43 Exit Loop Error Failure or missing loop SHORT or OPEN LiftMaster Plug in Loop Detector only Check loo...

Страница 33: ...rom other operator Check inputs and communication method between operators either wired bus or radio Ensure operator is powered May have to erase the wireless communication and reprogram the two opera...

Страница 34: ...ery low MEDIUM BLINK 1 blink per second Battery critically low ACC PWR OVLD OFF Accessory power is okay ON Accessory overload protector opened INPUT LEDS OPEN CLOSE STOP INPUT OFF Input inactive ON In...

Страница 35: ...input LEDs b Stop button is active c Reset button is stuck d If on battery power only low or dead batteries e Entrapment Protection Device active f Vehicle loop detector or vehicle probe active a Che...

Страница 36: ...ct Press the reset button to shut off alarm and reset the operator Alarm beeps three times with a command a Low battery a Check if AC power is available If no AC power then running on batteries and ba...

Страница 37: ...rator insufficient standby time a Insufficient panel wattage b Excessive accessory power draw c Battery capacity too low a Add more solar panels b Reduce the accessory power draw by using LiftMaster l...

Страница 38: ...e average solar radiation and the temperature effects on batteries in the given zones as shown on the map below Local geography and weather conditions may require additional solar panels Solar powered...

Страница 39: ...lar applications SOLAR GATE CYCLES PER DAY BATTERY CURRENT DRAW mA ZONE 1 ZONE 2 ZONE 3 7AH batteries Two 7AH batteries 33AH batteries 7AH batteries Two 7AH batteries 33AH batteries 7AH batteries Two...

Страница 40: ...IRE GAUGE AWG 20 WATTS OF PANELS 40 WATTS OF PANELS 60 WATTS OF PANELS 16 235 71 6 m 115 35 1 m 80 24 4 m 14 375 114 3 m 190 57 9 m 125 38 1 m 12 600 182 9 m 300 91 4 m 200 61 m 10 940 286 5 m 475 144...

Страница 41: ...Batteries Solar panel applications require the Solar Harness Kit model K94 37236 see Accessories Wire the Solar Panels Proceed to the Dual Gate section if applicable or proceed to the Adjustment secti...

Страница 42: ...e set properly the operator will automatically exit limit setting mode Refer to the Adjustment section and follow the instructions for Fine Tune the Force and Obstruction Test Perform the Obstruction...

Страница 43: ...gainst fire and electrocution l DISCONNECT power AC or solar and battery BEFORE installing or servicing operator For continued protection against fire l Replace ONLY with fuse of same type and rating...

Страница 44: ...s K94 37236 Battery Harness for 33AH batteries K1A6408 APE Assembly with plastic tray RPM board with mounting hardware K94 37259 Wiring Harness with product ID 1941240D 41 Chain 10 feet 1950307 41 Mas...

Страница 45: ...04AL S505AL S506AL Wraparound round monitored edge 4 ft 5 ft 6 ft Models WR4 WR5 WR6 Wraparound square monitored edge 4 ft 5 ft 6 ft Models WS4 WS5 WS6 Remote Controls LiftMaster offers a variety of L...

Страница 46: ...r gate operation The heater can be powered by 110 to 250 Vac Model HTR Wire harness Between main control board and expansion board Model K94 34778 LiftMaster internet gateway Internet enabled accessor...

Страница 47: ...ION TO THE THREE YEAR LIMITED WARRANTY PERIOD SET FORTH ABOVE AND NO IMPLIED WARRANTIES WILL EXIST OR APPLY AFTER SUCH PERIOD Some states do not allow limitations on how long an implied warranty lasts...

Страница 48: ...300 Windsor Drive Oak Brook IL 60523 LiftMaster com 2018 The Chamberlain Group Inc All Rights Reserved 01 39379B...

Отзывы: