5
INTRODUCTION
CARTON INVENTORY
NOT SHOWN:
Documentation packet and hardware bag
Warning Signs (2)
Post Bracket
Gate Operator
Junction Box
Gate Bracket
Wire Nuts (6)
Standard Control Box
with 2 Batteries
Pull-to-Open Bracket
Watertight Connector (2)
Cable Ties (4)
Extension Cable
12V 10W Solar Panel
Model SOLPNL10W12V (1)
LA412DCS ONLY
Gate Operator
Post Bracket
Gate Bracket
Pull-to-Open Bracket
Connector
LiftMaster Monitored Retro-Reflective Photoelectric Sensor
HARDWARE INVENTORY
NOTE:
Hardware quantities shown below are for LA412DC. Quantities are doubled for LA412DCS.
Flat Washer 3/8" (3)
Hex Nut 3/8"-16 (3)
Lock Washer 3/8" (3)
Hex Bolt 5/16"-18 x 1-1/2" (1)
Carriage Bolt 3/8" x 5-15/16" (2)
Hex Bolt 3/8"-16 x 1-1/2" (1)
Hex Nut 5/16"-18 (1)
Hairpin Clip (2)
Flat Washer 5/16" (1)
Lock Washer 5/16" (1)
Pin (2)
Keylock Cap
Key (2)
OPTIONAL ACCESSORIES (ORDERED SEPARATELY)
Large Metal Control Box for Solar Applications (Model
XLSOLARCONTU)
Ideal for installations that require additional room in the control box
(batteries not included). Requires two 33AH batteries, battery tray, and
solar battery harness (refer to accessories).
Push-to-Open Bracket (Model 50-19503)
If your application requires the gate to be pushed open, a push-to-open
bracket is required (refer to accessories).