Rev C
Doc 6001287 (01-20284)
18 of 40
O.
FINAL ASSEMBLY OF GATE OPERATOR
Figure 12. Gate Operator Final Assembly.
1. Install gate operator top cover and secure with two wing nuts.
2. Swing hinged control box into cabinet and secure in place with hardware provided.
3. Install clear cover on control box and secure with the four screws provided.
4. Make sure that gate operator unit power switch is turned on.
5. Install gate operator cabinet access door and lock.
6. Cycle the gate to ensure it is operating properly.
Содержание BG 3000-B1
Страница 2: ......
Страница 39: ...Rev C Doc 6001287 01 20284 34 of 40 APPENDIX B MODEL BG 3000 B1 PARTS LIST ...