background image

 

  

 
 

 

 

I-PR3I-01.doc 

 

 

Issue 03  

18/07/2019 

 

 

 
 
 
 

                                             IOM 

 

PROTECTA LED (IND)

 

 

the clamping bar will begin to open.  Insert the tool in the other clamping bar slot and gently lever away from the 
diffuser the clamping bar will open and the cover will be retained by the hinge.  Should difficulty be experienced 
reinsert the tool in the first slot and repeat the procedure. 
The procedure for closing and securing the cover is as follows: 
Ensure  the  hinge  mechanism  is  clear  of  any  obstruction  and  then  swing  the  diffuser  into  the  closed  position.  
Support the diffuser in position whilst pushing the clamp bar over the edge of the diffuser.  Apply even pressure 
at both ends of the bar and press the bar over centre. 
 

3.8.2  Removal and Replacement of Clamping Bar (if required) 

Open the luminaire as above and remove the diffuser or let it swing down.  Press the clamping bar towards the 
closed position, tip forward beyond the closed position and the clamping bar will be released from the body.  To 
replace the clamping bar, put in position on the body with the front edge pointing as far inwards as it will go.  Click 
the  bar  outwards  and  bring  back  to  the  normal  closed  position.    The  clamping  bar  should  then  be  secured  in 
position,  open  the  clamping  bar  fully  by  using  hand  or  screwdriver  pressure  (avoid  damaging  the  gasket),  the 
clamping bar is then ready to accept the normal closure of the diffuser. 
 

3.8.3  Releasing the LED Tray / Gear Tray 

Loosen the four fixing screws retaining the LED / Gear tray and slide over keyhole slots.  The tray will hang on the 
retaining cords without stressing the wiring between body and tray.  Replace in reverse order. 
 

3.8.4  Retro Fitting Lamps to LED’s

 

Before opening the front cover ensure that the luminaire is isolated from the mains supply.  Access for retro fitting 
is via the front cover, care is to be taken as there is limited suspension of the cover.  Make sure that the correct 
ESD protection is taken during LED replacement to avoid electric discharge to the PCB. 
 

3.8.5  Commissioning 

Energise the mains and check that LED’s light when the supply is energised. 
Emergency luminaires are supplied with the Battery plug/Socket disconnected. Just prior to switching power on, 
connect battery plug and socket. 
Emergency  luminaires  will  require  battery  packs  to  be  cycled  to  obtain  the  full  duration/capacity  of  the  Ni-Cd 
battery  cells.   It  is  recommended  that  the  unit  is  charged  for  a  minimum  period  of  24  hours, then  permitted  to 
discharge via emergency operation (power OFF), and then charged again for a minimum period of 24 hours. 
If checking battery duration at this time it may be necessary to repeat the cycle to obtain the full 3 hour duration. 
 

3.8.6    Post Commissioning Storage 

It is assumed that during commissioning the battery plug and socket are connected. 
If  the  power  is  to  be  removed  after  commissioning  for  a  period  of  time,  our  recommendations,  along  with 
guidance from the battery manufacturer, are: 

  Up to 6 months – No action required. Mains power can be reapplied during this time and the battery will 

accept a charge.  

  6 to 12 months – Disconnect battery plug and socket to maintain charge in the battery.  

Before  re-connection  of  mains  power  re-connect  the  battery  plug  and  socket.  Mains  power  can  be 
reapplied and the battery will accept a charge.  

  Longer than 12 months – Disconnect battery plug and socket. Approximately every 6 months carry out a 

charging/discharging cycle, 24 hours charging followed by 3 hour discharge and another 24 hour charge, 
then isolate power and disconnect battery plug & socket. This is to avoid deep discharge of cells, which 
is  caused  by  a  trickle  discharge  or  by  long  term  storage.   This  could  lead  to  the  cells  not  accepting  a 
charge from the inverter or not achieving full expected duration. 

  If the battery is to be checked separately, it should be charged using a 

constant current charger

 at 

200/400mA for 30/15 hours for the 4Ah.  Discharge measurement is not easy as the current is 
proportional to the voltage for resistance loads, so it has to be averaged.  Discharge the battery at 1 to 
2A and multiply current by time.  Do not discharge below 1 volt per cell, which is 5V.  The capacity should 
be 75% or more of normal. 
 
 
 
 

Содержание Protecta Series

Страница 1: ... Protecta LED Luminaires Industrial Important Please read these instructions carefully before installing or maintaining this equipment Good electrical practices should be followed at all times and this data should be used as a guide only MODEL SIZE DIMENSION A DIMENSION B 02L 742 400 04L 742 400 07L 1352 700 ...

Страница 2: ...e and condensation Any specific instructions concerning emergency Luminaires must be complied with Battery packs in storage should be cycled charged discharged charged every 9 months as per instructions below Always disconnect battery plug and socket for storage Any specific instructions concerning emergency luminaires must be complied with Warning Battery packs not cycled and stored for a year ma...

Страница 3: ...and 6mm are available State which on order If work is to be done on any Luminaire which has already been connected to the electrical system it must be isolated from the system The diffuser cover is swung down and removed if convenient by swivelling back as far as possible and the reflector tray is then slid out after releasing the locking screws This gives access to the mains terminals Standard fi...

Страница 4: ...5 Commissioning Energise the mains and check that LED s light when the supply is energised Emergency luminaires are supplied with the Battery plug Socket disconnected Just prior to switching power on connect battery plug and socket Emergency luminaires will require battery packs to be cycled to obtain the full duration capacity of the Ni Cd battery cells It is recommended that the unit is charged ...

Страница 5: ...ge and replace if necessary 8 If it has been suspected that the Luminaire has suffered mechanical damage a stringent workshop check on all components should be made All components can be removed from the Luminaire for inspection 4 0 Electrical Fault Finding and Replacement The supply must be isolated before opening the Luminaire Any live fault finding must be done by a competent electrician and if...

Страница 6: ...ry will remain on charge for an uninterrupted 24 hours At this time the module will conduct a commissioning test for the full duration The 24 hours recharge occurs also if a new battery is connected or the module exits the rest mode condition The following automatic commissioning duration test is only performed when a battery is replaced and fully charged after 24 hrs and the interval time is not ...

Страница 7: ... test underway Slow flashing green 1 sec on 1 sec off Duration test underway Red LED on Load failure Open circuit Short circuit LED failure Slow flashing red 1 sec on 1 sec off Battery failure Battery failed the duration test or function test Battery is defect or deep discharged Incorrect battery voltage Fast flashing red 0 1 sec on 0 1 sec off Charging failure Incorrect charging current Green and...

Страница 8: ...lektronischen Geräte Systeme 2011 65 EU RoHS II Directive On behalf of the Chalmit I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms to all technical and regulatory requirements of the above listed directives En tant que représentant du fabricant Chalmit je déclare qu à la date où les équipements accompagnant cette déclaration s...

Отзывы: