background image

SRM10-IOM-A.doc 

- 1 - 

Rev. 02/21/19 

 

Installation, Operation & Maintenance Manual 

Multi-Purpose 

Short-Rise Lift 

 

Model SRM10  

10,000

 LBS

.

 

C

APACITY

 

 

2311 South Park Rd Louisville, Kentucky 40219 

Email:

[email protected]

 Web 

site:

www.challengerlifts.com

 

Office 800-648-5438 / 502-625-0700   Fax 502-587-1933 

 

IMPORTANT:

 

READ THIS MANUAL COMPLETELY 
BEFORE INSTALLING or OPERATING 
LIFT 

Содержание SRM10

Страница 1: ...se Short Rise Lift Model SRM10 10 000 LBS CAPACITY 2311 South Park Rd Louisville Kentucky 40219 Email sales challengerlifts com Web site www challengerlifts com Office 800 648 5438 502 625 0700 Fax 50...

Страница 2: ...22 17 3 4 Lowered Height 4 1 4 Lifting Capacity Hydraulic Pressure Cap 10 000 lbs 1720 PSI Lock Heights 13 3 4 18 3 8 21 1 4 9 1 2 14 1 8 17 Overall Width 87 1 2 73 1 4 Overall Length 92 7 8 85 1 2 R...

Страница 3: ...Flush Mount Layout Fig 2 Flush Mount Pit Layout Provided By Others A A A A A A A A A A A A A A A A A A VIEW A A A A A A A A A A A A A A A A A A A A VIEW A A A A A A A A A A A A A A A A A A A A VIEW A...

Страница 4: ...ift Safety decals similar to those shown here are found on a properly installed lift Be sure that all safety decals have been correctly installed on the lift Verify that all authorized operators know...

Страница 5: ...factory lift performance property damage or personal injury Vertical Clearance Check the height of the area where the lift is to be installed Clearance should be calculated based on the full raised he...

Страница 6: ...r holes until lift can be fully raised and lowered to ensure there are no interferences Fig 4 Flush Mount Installation Power Unit CAUTION If lift is to be used in a paint booth the electrical power un...

Страница 7: ...but do not tighten yet 21 For Flush Mount only there are 8 5 8 diameter holes in the front platforms and 2 5 8 holes in the lock rod support bracket Use the platforms as a template and drill holes and...

Страница 8: ...s are qualified and they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with the lift manufacturer s...

Страница 9: ...n a frame engaging or pad lift Contact vehicle manufacturer for raising or jacking details 3 Before lifting the vehicle be sure that A Individual axle weight of vehicle does not exceed one half lift c...

Страница 10: ...o continue to lower lift DO NOT override self closing lift controls 6 Before moving vehicle remove any spacer pads and be sure lift is at the fully lowered position LOSS OF POWER If for any reason the...

Страница 11: ...if missing or damaged See Installation instructions page 3 See repair parts breakdown for replacement parts ALWAYS Keep all anchor bolts tight 1 2 Anchors 30 ft lbs 3 4 Anchors 80 ft lbs ALWAYS Keep...

Страница 12: ...SRM10 IOM A doc 12 Rev 02 21 19 PARTS BREAKDOWN...

Страница 13: ...x 155mm with M18 Thread 20 03 0382 2 Front Leg Weld 21 SR 0114 8 M18 Nylon Locknut 22 03 0384 1 Lock Leg Weld 23 SR 0115 1 Lock Release Pin 24 SR 0120 4 Hole Plug 46mm White 25 03 0392 2 Ramp Weldment...

Страница 14: ...read and fully understand the operating instructions and all decals on the product Do not attempt to use this lift for anything other than its intended purpose If vehicle begins to tilt as it is raise...

Страница 15: ...Elbow 5 4 68029 Anchor Bolt 1 2 x 3 1 2 lg 6 2 62 0011 or 62 0011 30 3 8 Hydraulic Hose x 20 lg or 30 lg 7 1 AB 1563 A 115VAC Power Unit 60Hz AB 1563 220 230VAC Power Unit 50 60Hz Replace all worn dam...

Отзывы: