Models EV1020QC
Installation, Operation and Maintenance
Rev. 8/25/20
EVQC-IOM-A.doc
7
Finished
Floor
1/2-13 x 18
All Thread Rod
1/2-13
Nut and Washer
6 x 6 Support
1/2-13 x 18
All Thread Rod
Lift / Containment
Assembly
Concrete Tie Anchor
1/2-13
Nut and Washer
Existing Floor
New Floor
Fig. 4
4.
Plumb and level using a machinist level on top of each bearing assembly. Level
in several directions.
DO NOT
level off the lift frame.
5.
Select the power unit location so that the driver or passenger side of the vehicle
is within view. Operator should be in a position to notice any misalignment of the
vehicle during the lifting operation
.
Run the 2" PVC chase from the control area
and join to the lift / containment assembly using the coupling provided. Use a
soap water solution to ease assembly. All PVC joints must be leak proof. The
power unit end of the chase should be finished as shown in
Fig. 5
to prevent
contamination from entering the chase, while allowing the system to breathe.
18.0" Min.
2" PVC Chase
Lock Release Valve Bracket Assy.
Power Unit
Wall Mounting Bracket
5/16-18 Hex Bolt, Washer and Nut
Fig. 5
Note: The power unit location needs to be high enough to avoid inadvertently
depressing the lowering valve handle with a tool cart, oil pan, etc.