Chaffoteaux & Maury Britony Combi SE Скачать руководство пользователя страница 6

6

1

2

3

0

4

bar

A

A

REMOVAL AND REPLACEMENT OF PARTS

1

2

3

B

B

A

A

1

2

P

Before removing appliance case, isolate
the gas and electrical supplies. Isolate
boiler from the system and drain before
removing any component in the water-
ways. Ensure that the appliance is cool.

1. Outer Case
Remove four screws in base of case and
lift free. When replacing, carefully locate
on lugs on top edge of chassis.

5. Ignition Electrodes
Carry out steps and as above. remove
the wiring cover undo the power lead plug
open the electrical box 2 clips.
Dicconnect leads from spark generator on
PCB. Loosen screws securing the closure
plate and remove. Remove grommet from
base of sealed chamber. Remove screw
securing electrode bracket and lift clear
easing spade connectors through the
grommet. Reassemble in reverse order,
twisted together electrodes cable at least
10 times to avoid electrical interference.

6. Burner Assembly
Carry out steps 1,2, disconnect elec-
trodes as mentionned in section and 5.
Remove two screws securing burner
assembly to the back panel of the boiler.
Lift right hand back corner first.
Reassemble in reverse order.
Carry out combustion tests utillising the
test points on the turret

7. Gas Solenoids
Disconnect colour coded leads. Remove
six screws. The solenoids are attached to
their base plate. Lift clear taking care not
to lose the three plungers and springs.
Reassemble in reverse order replacing
the cork gasket.

8. Fan Assembly
Remove outer case and sealed chamber
front panel (See Steps and 2).
Disconnect spade connectors noting
positions. Remove two screws securing
the front of the fan assembly and loosen
screw on flue outlet. Twist fan assembly
anticlockwise to disengage from flue out-
let and lift clear.
Re-assemble in the reverse order ensur-
ing that the wiring is re-connected cor-
rectly and the screw on the flue outlet
tightened.

9. Flue Hood
Carry out steps and as above.
Remove fan assembly as in step 8.
Remove the three screws securing the
angled top of the hood to the chassis. Lift
and remove taking care not to snag the
pressure switch cables. Re-assemble in
the reverse order ensuring that the hood
is located behind the combustion cham-
ber rear panel.

2. Combustion Chamber
Unscrew four self tapping screws secur-
ing the sealed chamber front panel and lift
over top corner locating lugs. Unscrew
four self tapping screws to release com-
bustion chamber front plate and lift clear.
Reassemble in reverse order.

3. Burner Manifold
Carry out steps and as above.
Remove two screws securing the closure
plate and the remaining four screws to
release the manifold. Lift clear. Replace
the manifold gasket. Reassemble in
reverse order.

4. Ionisation Electrode
Carry out steps and as above. Loosen
screws securing the closure plate and
remove. Disconnect the lead from the
main wiring loom. Remove screw secur-
ing electrode to burner. Thread wire
through grommet and lift clear.
Reassemble in reverse order.

10. Pressure Switch
Remove outer case and sealed chamber
front panel as in steps and 2.
Disconnect three pressure switch cables
noting their positions.
1 = white cable  connected to NC
2 = black cable connected to NO
P = orange cable connected to C
Remove screw securing the switch brack-
et to the chassis. Disconnect the sam-
pling tubes again noting their positioning
(+ and -).
Remove switch. Reassemble in reverse
order.

11. Pressure Switch Venturi
Carry out steps 1and 8, as above.
Disconnect the sampling tubes and
remove the screw securing the venturi to
the flue outlet. Remove venturi by the bot-
tom of the 45° elbow. Reassemble in
reverse order.

12. Drain down
2 drain points are located on the boiler. 

1 = DHW circuit drain point
2 = Heating circuit drain point

(Pressure releave valve)

(air separator)

1

2

13. DHW Water filter
The DHW filter is located in the DHW
command 47 Fig. 5 on the right hydraulic
assembly. Remove the clip and pull
toward you the DHW command remove
the plug and clean the filter. Reassemble
in reverse order.

14DHW Flow switch
Disconnect the electrical connections
undo the securing clip and remove the
microswitch reassemble in reverse order.
46 Fig. 5

                                                                            

Содержание Britony Combi SE

Страница 1: ... Maximum Minimum Maximum Minimum power 24 kW power 9 5 kW power 28 kW power 12 5 kW Natural gas G 20 at 20 mbar 2 74 m3 h 1 22 m3 h 3 34 m3 h 1 57 m3 h Butane gas G 30 at 28 mbar 2 04 kg h 0 91 kg h 2 45 kg h 1 17 kg h Propane gas G 31 at 37 mbar 2 00 kg h 0 89 kg h 2 42 kg h 1 15 kg h Injectors and gas valves seat diameter BRITONY Combi SE 80 BRITONY Combi SE 100 Natural gas Butane or Propane Nat...

Страница 2: ... 2 Ignition electrodes 28 Ionization electrode 29 Gas section comprising 30 Security valve grey 31 Security valve grey 32 Second stage solenoid 33 Right hydraulic assy 34 Left hydraulic assy 35 Single speed pump 36 Automatic air separator and automatic vent 37 Heating mode indicator 38 DHW mode indicator 39 Combustion chamber made of aluminium coated steel with 4 ceramic fibre panels to insure hea...

Страница 3: ...ise 16 The DHW indicator will light 38 2 Turn on a hot water tap the orange burner on indicator will light 21 and the water will become hot Heating 1 Turn the CH thermostat clockwise 17 The CH indicator will light 37 0 1 2 3 bar Control panel BRITONY COMBI FUNCTIONAL DIAGRAM I reset 42 43 12 40 13 28 27 24 29 30 31 32 14 44 18 35 7 46 48 45 10 47 41 5 4 3 1 36 9 49 42 43 12 40 13 28 27 24 29 30 31...

Страница 4: ...to a demand for hot water This will interrupt the central heat ing for the duration of hot water delivery Central Heating Mode To be able to supply heating the main switch 15 Fig 4 must be in I position This will be confirmed by the green indicator light 20 Fig 4 Turn the selector switch 17 clock wise to establish the green heating indicator 37 Fig 4 When there is a demand for heating either from ...

Страница 5: ...are clean Check clean and replace components as necessary Carry out combustion test utilising the test points in the flue turret SUGGESTED SEQUENCE for SERVIC ING Before disconnecting or removing any parts isolate the gas and electricity sup plies Ensure that the appliance is cool for detail please see section on Parts Removal and Replacement Preliminary Checks Remove outer case Check the system p...

Страница 6: ...hree screws securing the angled top of the hood to the chassis Lift and remove taking care not to snag the pressure switch cables Re assemble in the reverse order ensuring that the hood is located behind the combustion cham ber rear panel 2 Combustion Chamber Unscrew four self tapping screws secur ing the sealed chamber front panel and lift over top corner locating lugs Unscrew four self tapping s...

Страница 7: ...arth plug from earth socket Pivot the electrical box downwards Unscrew the nut F of the flow pipe from the volute Remove the clip H on the pump volute and pull pump toward you Remove the back clip Reassemble in reverse order 19 Pressure relief valve Drain the boiler first unscrew the safety valve head with a 24 mm spanner Reassemble in reverse order 20 Thermistors Drain the boiler as step 12 Disco...

Страница 8: ...tion Check that the pump spins free Check voltage in the pump electrical box Replace control PCB Could you hear the spark generation Check air pressure switch continuity between P and 2 Replace fan assembly Check pressure probes or Check flue duct condition or Replace pressure switch Yes Yes Yes No No No No Ok Ok Ok No Check or replace main or sec ondary heat exchangers They could be fully scaled ...

Страница 9: ...e rise Does the orange LED alight Does the orange LED alight Replace control PCB Replace DHW thermistor Replace the 3 way valve Replace the 3 way valve Replace control PCB Stop water draw off Wait until the return pipe becomes hot then rotate the heating control knock anticlock wise to minimum Adjust the DHW flow rate to 3 l min on a tap Wait until the temperature becomes stable Put the selector s...

Страница 10: ...ater thermistor faulty open circuit m m l m l m Domestic hot water thermistor faulty short circuit m m l m l l Central heating thermistor flow faulty open circuit m m l l m m Central heating thermistor flow faulty short circuit m l m m m l Low water pressure in the Central Heating circuit m l m l m l Fan on but does not activate air pressure switch m l m l l m Fan off but air pressure switch fails...

Страница 11: ...WATER HEAT EXCHANGER 1302409 535 PRESSURE RELIEF VALVE KIT 81980 545 DIAPHRAGM 81977 560 AIR SEPARATOR HEAD ASSEMBLY 1304608 572 PUMP AIR SEPARATOR 15 50 1301964 PUMP AIR SEPARATOR 15 60 1303461 575 BY PASS 1301960 592 WATER CONTROL 8L MN 1301952 WATER CONTROL 10L MN 1305290 594 FLOW REGULATORE 8L MN RED 1017288 08 FLOW REGULATORE 10L MN WHITE 1017288 10 607 PRESSURE GAUGE 1303159 615 PRINTED CIRC...

Страница 12: ...ned in this document Manufacturer Chaffoteaux Maury France Commercial subsidiary MTS GB Limited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet www chaffoteaux co uk E mail info uk mtsgroup com Technical Support Help Line 0870 241 8180 Customer Service Help Desk 0870 600 9888 This appliance is suitable for Natural gas or LPG A gas conversi...

Отзывы: