Before mounting the unit, the
transducers must be wired to it.
Remove the 4 screws holding the case
halves together.
Remove any plugs from the
transducer cables then feed
the cables through the cable
glands.
Wire them to the terminal
blocks as indicated below.
Refit the two case halves back together, being careful not to trap the cables
behind the large capacitor.
Check that the power is disconnected and connect the output cable to one
of the 3 NMEA-IN ports of a C-net 2000 instrument.
Where a screen/chassis connection point is available (NOT Ships Supply -ve),
connect the screen of the output cable to it.
Finally mount the 930346 Interface box to the bulkhead.
INSTALLATION
Position the 930346 Interface on a
vertical bulkhead, with the cable glands
pointing down.