![Cervis Warrior MU-X9 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/cervis/warrior-mu-x9/warrior-mu-x9_system-manual_2584029008.webp)
U120.0.1
4
Receiver 1 (RX#1)
This receiver is designated for the bridge/main line contactor (MLC) and must be mounted and
wired to that control panel as illustrated in Figure 3.
Figure 3. Receiver 1 Wiring Diagram
Note: At various times throughout system startup, relay K7 energizes to alert the operator
that the receiver is on and “linked” with the transmitter. Relay K7 should be wired to a horn or
light to take advantage of this feature. See Figure 6 for master installation drawing.