C400 User Manual 

Page 19 

TRANSPORTING THE UPS 
 
 

 

The  following  procedure  should  be  performed or  supervised by personnel  knowledgeable about  batteries 
and the required precautions. Keep unauthorised personnel away from batteries. If the UPS requires any type 
of transportation, the batteries must be disconnected (but not removed) before the unit is transported: 

 

Verify that the UPS is off and disconnected from mains power 
Place the UPS on a flat stable surface with the front of the cabinet facing you 
Remove the UPS front cover 
Disconnect the internal battery connectors 
Replace the UPS front cover 

 
To avoid damage and 

to prevent DOA’s always use a reputable courier for all equipment transportation.

 

 
STORING THE UPS 
 

 
Where UPS equipment is stored for a long period of time, the batteries must be recharged every six months. The 
optimal storage vdc for VLRA batteries, depending on the environment is between 20-40%. This can be achieved by 
connecting the UPS to mains power.  

 

DO NOT 

store the equipment in a warm, damp, dusty environment 

 

DO NOT 

use the equipment if the batteries have not been recharged/if the recharge date exceeds six months  

 

DO NOT 

Expose the UPS to direct sunlight or source of heat 

 

 

DO 

Store the equipment in a cool, dry, clean environment  

 

DO 

ensure the batteries are recharged every six months for a minimum of 48 hours 

 

DO 

ensure EBMs are recharged every six months for a minimum of 3 hours 

 

 
 
BATTERY REPLACEMENT 
 

 

 

 

 

DO NOT 

Allow unauthorised personnel near the batteries. Servicing should be performed by qualified, knowledgeable personnel only 

 

DO NOT 

Dispose of batteries in a fire. Batteries may explode when exposed to flame   

 

DO NOT 

Open or modify the battery or batteries in any way. Released electrolyte is harmful to the skin and eyes and maybe extremely toxic 

 

DO NOT 

Attempt to alter any battery wiring or connectors. Attempting to alter wiring can cause injury 

 

 

DO 

Ensure personnel servicing the batteries are all knowledgeable on the required precautions for battery servicing  

 

DO 

Replace the batteries with the same type and number of batteries or battery packs  

 

DO 

Dispose of the batteries responsibly. Please refer to local regulations and disposal requirements 

 

DO 

Determine if the battery is inadvertently grounded. If inadvertently grounded, remove contact to ground. Contact with any part of a grounded 

battery  can  result  in  electrical  shock.  The  likelihood  of  shock  can  be  reduced  if  grounds  are  removed  during  installation  and  maintenance 
(applicable to equipment and remote battery supplies not having a grounded supply circuit).

 

 

DO 

Disconnect charging source prior to connecting or disconnecting battery terminals 

 

 
 
Batteries can present a risk of electrical shock or burn from high short circuit current. Observe the following precautions: 

 

Remove watches, rings, or other metal objects 
Use tools with insulated handles 
Do not lay tools or metal parts on top of batteries 
Wear rubber gloves and boots 

THE INTERNAL UPS BATTERIES MUST BE DISCONNECTED BEFORE TRANSPORT

 

UPS BATTERIES MUST BE RECHARGED EVERY SIX MONTHS. ALWAYS CHECK THE BATTERY RECHARGE DATE ON THE 
SHIPPING CARTON BEFORE USE. 

 

DO NOT DISCONNECT THE BATTERIES WHILE THE UPS IS IN BATTERY MODE

 

CONSIDER ALL WARNINGS, CAUTIONS, AND NOTES BEFORE REPLACING BATTERIES 

 

ELECTRIC ENERGY HAZARD. DO NOT ATTEMPT TO ALTER ANY BATTERY WIRING OR CONNECTORS. 
ATTEMPTING TO ALTER WIRING CAN CAUSE INJURY

 

Содержание C400 Series

Страница 1: ...ON AND USER GUIDE THE C400 SERIES An uninterruptible power supply UPS incorporating online double conversion technology which eliminates all mains power disturbances www certaups com For assistance please contact your local CertaUPS partner ...

Страница 2: ...N 11 C400 SERIES STARTUP AND SHUTDOWN 12 STARTING THE UPS WITH MAIN POWER PRESENT 12 STARTING THE UPS FROM BATTERY 12 UPS SHUTDOWN WITH MAINS POWER 13 UPS SHUTDOWN WITHOUT MAINS POWER 13 C400 SERIES OPERATION 13 DISPLAY FUNCTIONS 13 LCD DESCRIPTION 14 USER SETTINGS 15 COMMUNICATION PORTS 16 EPO CONNECTION 16 INTERFACE CARDS OPTIONAL 16 SOFTWARE 16 WINPOWER INSTALLATION 17 UPS MAINTENACE 18 UPS CAR...

Страница 3: ...C400 User Manual Page 5 TECHNICAL DATA 23 OPERATING ENVIRONMENT 23 RUNTIMES 24 DIMENSIONS AND WEIGHTS 24 ...

Страница 4: ...erson 55 kg 120 lb Forklift Before any handling please ensure that the following precautions are taken QUALIFIED PERSONNEL Any persons servicing the UPS must be qualified and knowledgeable in UPS technology and batteries CLOTHING Correct PPE should always be worn POWER OFF Ensure all mains power is disconnected before starting work TOOLS always use insulated tools Do not lay tools down near the Up...

Страница 5: ...hey appear within this manual DO check that the indicators on the rating plate correspond to the AC powered system and to the actual electrical consumption of all the equipment to be connected to the UPS DO ensure the outlet is installed near the UPS and is easily accessible DO store the UPS in a dry environment DO keep the UPS in a well ventilated area Additional considerations To reduce the risk...

Страница 6: ...hase output 6 C400 030 C 3000VA 2700W Tower Charger model Single Phase input Single Phase output THE TECHNOLOGY The C400 UPS series uses online double conversion technology which ensures that clean and stable power is always provided An online UPS operating in line mode will always provide a consistent supply of AC power to the load This is done by using the battery and the inverter to ensure a cl...

Страница 7: ... C REL Relay card C DB9REL Relay card DB9 Interface C EMP Environmental monitoring probe SNMP required C MOD1 Modbus interface C MBS 1 3 Rack mountable Maintenance bypass switch UPS STANDARDS DESCRIPTION STANDARD Conduction Radiation IEC EN 62040 2 Harmonic Current IEC EN 61000 3 2 Voltage Fluctuation IEC EN 61000 3 3 ESD IEC EN 61000 4 2 RS IEC EN 61000 4 3 EFT IEC EN 61000 4 4 Surge IEC EN 61000...

Страница 8: ...e and outside of the devices are clear of condensation The UPS EBM units are heavy Follow any special precautions provided on the packaging Unpack the equipment and remove all packaging materials DO NOT lift the using the front panel and rear panel Rackmount Tower model C400 BOX CONTENTS CHECKLIST C400 Series UPS USB A to B Software CD Quick Start Guide Warranty Card PLEASE ENSURE ALL SAFETY INSTR...

Страница 9: ...tion STEP THREE If not installing additional EBMs skip to step six Position the EBM adjacent to the UPS ensure adequate space for UPS ventilation STEP FOUR Connect the EBM to the UPS STEP FIVE To connect to multiple EBMs the EBM cable is connected directly into the previously installed EBM STEP SIX After setting up the UPS the load can then be connected Please make sure the load equipment is turne...

Страница 10: ...tery mode without output interruption to the UPS 5 When the UPS is online LINE will be displayed on the LCD display STARTING THE UPS FROM BATTERY Before using this feature the UPS must have been powered by utility power with output enabled at least once to ensure the unit is adequately charged After connecting the UPS to any EBMs you should wait for 10 seconds before pressing the On Silence button...

Страница 11: ...lf load status events measurements and settings In the event of a critical alarm the LCD backlight will illuminate red DISPLAY FUNCTIONS The following table shows the function of each of the buttons BUTTON FUNCTION DESCRIPTION ON Silence Button Power on When the unit has no mains power and batteries connected press for 100ms to power on Turn on When the unit is powered on and in Standby mode press...

Страница 12: ...Each segment represents 20 of the maximum rated load One segment would be displayed if the level is 0 20 BATTERY Indicates the battery capacity Each segment represents 20 of the full charge capacity MODE FAULT WARNING Indicates the operating mode Fault type Warning type or battery remaining time several warning types at the same time will be displayed alternately Indicates the UPS is in setting mo...

Страница 13: ...ternate between battery time in unit Min or Sec and bATT on the LCD every 2s 000 001 000 CHG CHARGING CURRENT 3 0 6 0 for C400 010 C 1 5 3 0 4 5 6 0 for C400 020 030 C Charger models only Consult your CertaUPS representative before adjusting any battery settings incorrect settings may damage your equipment Modes of operation ECO mode Economy mode Also called high efficiency mode After turning the ...

Страница 14: ... Power Off connection allows the UPS to be powered off by changing the state of a normally open circuit Normally closed Normally EPO connector is closed with a wire on the rear panel Once the connector is open the UPS will stop output until the EPO status is disabled INTERFACE CARDS OPTIONAL The Network Management Card allows the UPS to communicate with monitoring devices by utilising network conn...

Страница 15: ...ish Spanish French Portuguese Polish Thai Germanic Russian and Japanese Requires a GSM modem not supplied WINPOWER INSTALLATION STEP ONE Go to https www certaups com downloads download winpower STEP TWO Choose the operating system you need and follow the instruction described on the website to download the software STEP THREE When downloading all the required files from the internet enter the prod...

Страница 16: ...e of 20 25 C 77 F max Carry out regular environmental and battery checks The batteries are rated for a 3 5 year service life The service life varies depending on the frequency of usage and ambient temperature Batteries used beyond expected service life will often have severely reduced runtimes Replace batteries at least every 4 years to keep units running at peak efficiency and prevent failure ADO...

Страница 17: ...in a fire Batteries may explode when exposed to flame DO NOT Open or modify the battery or batteries in any way Released electrolyte is harmful to the skin and eyes and maybe extremely toxic DO NOT Attempt to alter any battery wiring or connectors Attempting to alter wiring can cause injury DO Ensure personnel servicing the batteries are all knowledgeable on the required precautions for battery se...

Страница 18: ... cause abnormality or permanent damage To test new batteries 1 Charge the batteries for 48 hours 2 Press the ON button when the UPS is turned on The UPS should start a battery test if The batteries are fully charged The UPS is in Normal mode with no active alarms Bypass voltage is acceptable During the battery test the UPS transfers to Battery mode and discharges the batteries for 10 seconds The f...

Страница 19: ...32 wire is not matched USB wire is not matched Check or change the RS232 USB cable Emergency supply period shorter than nominal value Batteries not fully charged or require replacement Charge the batteries until fully charged contact your CertaUPS representative FANF Fan fail Fan RPM out of tolerance Check if the fan is running HIGH Battery over voltage The battery is overcharged Switching to batt...

Страница 20: ...NTCO Inverter NTC open UPS internal fault Contact your CertaUPS representative SHOR Inverter short Output short circuit Remove all the loads Turn off the UPS Check whether the output of UPS and loads for short circuits Make sure the short circuit is removed and the UPS has no internal faults before turning on again OVTP Over temperature fault Over temperature Check the ventilation of the UPS check...

Страница 21: ...0W 2000VA 1800W 3000VA 2700W Voltage 220Vac 230Vac 240Vac Frequency 50 60Hz Wave form Sinusoidal BATTERIES Model No C400 060 B C400 060 C EBM C400 100 B C400 100 C EBM C400R 060 C EBM C400R 100 C EBM Voltage 24V 24V 48V 48V 72V 72V Capacity 9Ah 5Ah 120Ah 9 Ah 5Ah 120Ah 9 Ah 5Ah 120Ah OPERATING ENVIRONMENT Ambient Temperature 0 C to 40 C Full load no de rating 40 Cto50 C output power derated to 50 ...

Страница 22: ...00 020 C C400 BB2 4 124 Mins 175 Mins 283 Mins 300 C400 030 B NA 0 3 Mins 6 Mins 12 Mins 28 Mins C400 030 C NA 0 0 Mins 0 Mins 0 Mins 0 Mins C400 030 C C400 BB3 1 12 Mins 18 Mins 31 Mins 73 Mins C400 030 C C400 BB3 2 31 Mins 45 Mins 78 Mins 166 Mins C400 030 C C400 BB3 3 52 Mins 78 Mins 125 Mins 268 Mins C400 030 C C400 BB3 4 78 Mins 110 Mins 176 Mins 300 Calculated to 20 C DIMENSIONS AND WEIGHTS ...