Century FW3000 Installation and Operation Manual
4
Maintaining Your Wood Heating System ............................... 21
Replacing the Glass Gasket and/or the Glass .................................................. 22
Chimney and Chimney Connector Maintenance .................................................. 23
Why Chimney Cleaning is Necessary ............................................................... 23
How Often Should You Clean the Chimney? .................................................... 23
PART B - INSTALLATION ............................................................. 25
Safety Information ................................................................... 25
Summary of Installation Cautions and Warnings .................................................. 25
Clearances to Combustible Material ...................................... 26
Reducing Wall and Ceiling Clearances Safely ..................................................... 29
Table of Clearance Reduction Percentages...................................................... 30
The Venting System ................................................................. 31
The Relationship Between the Chimney and the House ...................................... 33
Why the chimney should penetrate the highest heated space .......................... 34
Installation of Single Wall Chimney Connector ................................................. 36
Содержание CB00009
Страница 8: ...Century FW3000 Installation and Operation Manual 8 ...
Страница 27: ...Century FW3000 Installation and Operation Manual 27 Clearances to combustible materials and floor protection ...
Страница 43: ...Century FW3000 Installation and Operation Manual 43 Appendix 4 Exploded Diagram and Parts List ...