Revision 3.0 September 2019
© 2019 Centrica plc. Registered office: Millstream, Maidenhead Road, Windsor, Berkshire. SL4 5GD.
Registered in England & Wales No 3033654
5
PAN-14 Sensor installation guide
Overview
This user guide explains how to install the PAN-14 sensors.
PAN-14 Current sensor
Current Transformer (CT)
Workflow
Sensor installation consists of the following steps:
1.
Panoramic Power deployment guide
2.
Physically attach the sensors and the CTs to the wires.
3.
Monitor the proper functioning of the sensors. See
Unpacking the hardware
Sensors are shipped in 3-unit packs.
CTs are not included and can be bought separately.