SKU 97511
93909
For Technical Questions, Please Call 1-800-444-3353
Page 7
OPERATION
NOTE:
For additional references to the parts listed below, refer to the
Assembly
Diagram on page 11.
1.
Adjust the Exhaust Cover (4) to direct exhaust as desired.
2.
To fire a nail, place the nose of the Nailer on the workpiece. The Nailer should
not fire if the Safety (38) is not depressed.
Once the Safety is depressed,
gently and briefly squeeze the Trigger once to fire one nail. Release
the Trigger
. Do not fire repeatedly; nails could bounce off on one another,
damaging the workpiece or causing personal injury.
3.
With the nose of the Nailer on the workpiece, squeeze the Trigger again to
fire another nail.
Continue firing nails as needed.
4.
When the work is completed, disconnect the air supply and remove the nails from
the nailer.
3. Orient a strip of nails with the points down, and drop the strip of nails into the
Magazine (71).
(See Figure C.)
4. Slide the strip of nails forward in the Magazine (71).
NOTE:
The Magazine will
hold 60, 10 gauge nails.
(See Figure C.)
5. Unlatch the Feeder Shoe (52), and allow the Feeder Shoe to slide forward against
the strip of nails.
(See Figure C.)
Loading Nails (continued)