background image

Содержание CL50

Страница 1: ......

Страница 2: ...6 42 EC EN ISO 11148 12 2012 Handheld non electric power tools EN ISO 13753 2008 Mechanical Vibra on and shock Atex Direc ve 2014 34 EU Based on the following Harmonised Standards EN13463 1 2009 And therefore complies with the essen al requirements of those direc ves Addi onal Informa on ATEX Coding II 2G T5 X Technical filie lodged with Element Materials Technology 0891 Technical File number CEEX...

Страница 3: ... should be followed as per the Health and Safety at Work Act We recommend that Eye protec on be worn when using Cengar Saws We recommend normal safe working prac ces should be followed as per the Health and Safety at Work Act or the appropriate Na onal and State Laws We recommend that eye and ear protec on be worn when using Cengar Saws Each machine is marked with a unique serial number which cont...

Страница 4: ...n inhibitors Incorrect oils if used will soon break down forming a sludge which will slow and eventually stop the ac on of the saw See maintenance details INSTALLATION OF BLADES Before a emp ng to insert or change a blade ensure that the air supply is isolated by opera ng the isola on valve provided Loosen the retaining grub screws with the key provided insert blade through nosepiece so that the t...

Страница 5: ...Ohm resistance between the ground at the air source and any metallic object to be cut with the equipment 3 The Saw shall be firmly abu ed to the work piece before opera on and quenched with liquid during opera on The saw is HUMAN OPERATOR CONTROLLED and THE OPERATOR MUST ENSURE LUBRICATION OF THE BLADE AT ALL TIMES The operator must stop the saw immediately if there is no lubrica on 4 The equipmen...

Страница 6: ...CL 50 75 Exploded View ...

Страница 7: ... 25 1147 Centre Sha 1 8 9560 O Ring Small 2 26 55516 Screws for above 2 9 9557 Détente Spring 1 27 1150 Link to Pistons 1 10 9556A Lock Screw 1 28 1148 Top Piston 1 2 to 10 9552 Isolator Assembly 29 1152 Bo om Piston 1 11 51834 Roll Pin Trigger 2 30 1147 Pin to Link 2 12 50034 Valve in Handle 1 31 1147 Pin to Pedestal 1 13 9502 Trigger 1 32 1153 5 Pedestal 1 14 9506 Filter Gauze 1 33 5540 Screw Ha...

Страница 8: ...CL 50FT 75FT Exploded View ...

Страница 9: ... 25 1147 Centre Sha 1 8 9560 O Ring Small 2 26 55516 Screws for above 2 9 9557 Détente Spring 1 27 1150 Link to Pistons 1 10 9556A Lock Screw 1 28 1148 Top Piston 1 2 to 10 9552 Isolator Assembly 29 1152 Bo om Piston 1 11 51834 Roll Pin Trigger 1 30 1147 Pin to Link 2 12 50034 Valve in Handle 1 31 1147 Pin to Pedestal 1 13 9502FT Trigger 1 32 1153 5 Pedestal 1 14 9506 Filter Gauze 1 33 5540 Screw ...

Страница 10: ...this will bring the link shoulders clear of the cylinder walls 2 Remove the centre sha by firstly removing the two retaining screws Part No 55516 and pushing the sha out carefully 3 Push the top piston forward the bo om piston will follow un l everything comes out 4 Before refi ng ensure that each piston is a smooth sliding fit in it s own bore without being able to feel slackness 5 Insert the pis...

Страница 11: ...he carrier over the front end tube all the way to the back and clamp ght with the Allen key provided 3 Slide on the new shortened silencer and refit the nosepiece The clamp carrier can remain on the saw for normal use when the clamp is not in use Always remove the saw from the airline before commencing any maintenance work Only fit genuine Cengar parts and accessories or safety may be compromised ...

Страница 12: ...nternal parts with anything other than a clean lint free cloth and M S Cleaner or Cengar Green oil 9 NEVER modify Cengar saws or use non Cengar parts this will invalidate ATEX approval and warranty ALWAYS 1 ALWAYS use Cengar green oil for best results Keeping the saw clean and well oiled will give excellent reliability and a long life 2 ALWAYS use Cengar Bi Metal Sha erproof blades for safety and ...

Страница 13: ...ng thicknesses of material in situ work can be done in ght spaces or very narrow trenches due to the compact actuator design Hand arm vibra on figures are reduced to Zero Cuts are kept square ready for weld joints Needs only 95mm of pipe length exposed Gives faster cu ng and extends blade life Operators are free to stand clear or prepare Complete power feed clamp CP1P As above plus CL75 mount kit ...

Страница 14: ...nal extras 9507CFA Op onal fall arrester plug to a ach to spring balance 1139FA Op onal Fall Arrester Bracket to a ach to spring balance LUB01 Op onal In Line lubricator 28cc capacity runs full day per fill ...

Страница 15: ...es and types available on request Cengar Green Oil GO 9107P Cengar Green Oil 250 ml plas c bo les for all air tools GO 9109 As above in 5 litre container GO 9110 As above in 25 litre container M S Cleaner MS 9105 1 litre General purpose cleaning fluid for air tools MS 9125 50 ml In a dropper bo le Enough for 10 tools Always use plenty of Cengar green oil a erwards Nosepiece 5045 Replacement nosepi...

Страница 16: ...77161 enquiries cengar com www cengar com SERVICE We offer a full factory repair and refurbishment service for Cengar Saws normally within 5 working days Quota ons at no charge can be given before work is carried out DISTRIBUTOR ADDRESS Original Instruc ons Document No MAN5075ENG 01 Issue 09 July 15 ...

Отзывы: