CEMB EZ10 Скачать руководство пользователя страница 8

ENGLISH

Installation manual  Ver. 05-2017

6

3.1  VISUAL INSPECTION

The packaging must be intact upon receipt, i.e.:

 

there must not be any sign of collision or breakage;

 

there must not be any sign that it was exposed to sources of heat, ice, 

water, etc...;

 

there must not be any sign of tampering.

Any deformations indicate that the machine was knocked about during 

transport and may compromise proper machine functioning.

3.1.1  Checking the machine and equipment supplied 

The main body of the machine, the relative accessories and the equipment 

supplied (as agreed with the manufacturer) must be in perfect condition.

The supply is carefully checked before shipment, nevertheless it is advis-

able to check upon receipt that it is complete and in order.

Check that:

 

the shipping data (addressee, number of packages, order number, etc.) correspond to the accompanying docu-

mentation;

 

the technical-legal documentation provided with the machine includes the instruction manual for the type of 

machine to be installed as well as the EC declaration of conformity or, alternatively, the declaration of the 

Manufacturer.

  In the event of defects and/or missing material immediately notify the manufacturer and follow his instructions 

 

 

 

 

before proceeding with installation and startup.

 

 

3.2 UNPACKING

To remove the packaging refer to the “arrow” shown on the outside box. 

Operate as follows to unpack the machine: 

1.  cut the plastic safety straps;

2.  open the top of the cardboard box;

3.  remove the top protection;

4.  remove any protective corner pieces;

5.  remove the cardboard box pulling it upward;

6.  remove any protective “pluriball”;

7.  inspect the machine to check for any damage. Immediately inform the carrier and the supplier in the event of 

  

apparent damage.

Keep the packaging materials for possible future shipment of the machine.

The packaging used is in compliance with the environmental requirements set out in the European packaging regulations  

(Official  EC  Gazette,  N.  L.  365/19).  The  cardboard  boxes  can  easily  be  recycled.  The  plastic  wrappings  are  made  of 

materials free of hazardous metals. It is advisable to contact the competent local authority for their disposal.

 

3. Unpacking and positioning

 

Unpacking and positioning

Содержание EZ10

Страница 1: ...3826 Mandello del Lario LC ITALY Telefono 39 706369 Fax 39 0341 700725 www cemb com garage cemb com The Manufacturer declines all liability for any damage to people or property caused by incorrect use...

Страница 2: ...ruzioni originali Translation of the original instructions Traduction de la notice originale bersetzung der Originalanweisungen Traducci n de las instrucciones originales Tradu o das instru es origina...

Страница 3: ...easures 4 2 7 AIRBORNE NOISE EMISSION 5 2 8 OPERATOR WORKING POSITION 5 3 UNPACKING AND POSITIONING 6 3 1 VISUAL INSPECTION 6 3 1 1 Checking the machine and equipment supplied 6 3 2 UNPACKING 6 3 3 PA...

Страница 4: ...the only reference to resolve any interpretation controver sies related to the translation into the European Community languages This publication forms an integral part of the machine and must theref...

Страница 5: ...nal education training and experience as well as knowledge of the standards requirements and provisions for accident prevention In addition the operator assigned based on the above must be specificall...

Страница 6: ...safety devices or ignore warnings and alarms be they communicated by the software or by warning labels fixed on the installation Should the plates adhesive labels decals or any other warning sign on...

Страница 7: ...ing operation the machine noise is subordinate to the background noise in the workplace the presence of other machines and other factors that cannot be assessed by the manufacturer in advance The user...

Страница 8: ...as well as the EC declaration of conformity or alternatively the declaration of the Manufacturer In the event of defects and or missing material immediately notify the manufacturer and follow his ins...

Страница 9: ...agents and with the following characteristics Ambient conditions as described above Positioned in such a way that it is protected against deformation crushing breakage etc Not subjected to knocks vibr...

Страница 10: ...leave a space of about 1 metre around the machine the place where the machine is installed must be free of corrosive explosive powders or gas the place of installation must be vibration free the ligh...

Страница 11: ...ENGLISH Installation manual Ver 05 2017 XX XX XX XX XX XX XX XX XX XX 9 4 Installation WARNING Pay attention to what is specified on the stickers below reserved for the market USA Installation...

Страница 12: ...ENGLISH Installation manual Ver 05 2017 Hz KW VERSION MODEL SER N V PHASE Year T C V A XXXXX 04PRB0568 XXXXX 10 Installation...

Страница 13: ...A EMS LR air currents or forced ventilation in the direction of the device may cause malfunctions or incorrect readings WARNING Shouldatthetimeofinstallationtheambientconditionsbedifferentfromthosepre...

Страница 14: ...t Ibs Un mauvais serrage peut entra ner des impr cisions d quilibrage et dommages la machine PAS COUVERTS PAR LA GARANTIE Eine regelm ige monatliche Kontrolle der richtigen Befestigung des Endst cks S...

Страница 15: ...ENGLISH Installation manual Ver 05 2017 SE2 DISMOUNTING A B C D E CH13 CH17 13 Installation...

Страница 16: ...that the wire cross section may not be less than 2 5 mm2 Make sure that the extension is arranged so that it does not constitute a risk or obstruction WARNING The connection to the single phase mains...

Страница 17: ...oper working methods and practices Pay attention to the position of your hands in the areas indicated in the figure as there is a risk of crushing your fingers during wheel locking on the spindle Whil...

Страница 18: ...ENGLISH Installation manual Ver 05 2017 16...

Отзывы: