background image

                

      

 

 

 
 
 
 

 

 

 

 

       

 

 
 
 
 
 

5 Assemble carcase as per layout 
plan 

3 Connect ring beams together 
using cleats and self tapping screws 

4 Connect rafters to ring beam 
using cleats and bolts provided 

6.Gable rafters to be secured to 
the house wall using suitable 
fixings depending on wall 
structure. 

Typical Spider assembly using pins 
and locking nuts provided 

Содержание Guardian Roof

Страница 1: ...lan and this guide Your fabricator will be available at all reasonable times to provide installation technical support Roof Layout Plan Please refer to the roof layout plan prior to commencing installation It is very important that the roof fits the windows layouts and that all the windows are reinforced All components are numbered to match the roof layout plan for ease of installation Sealing At ...

Страница 2: ...t issues this guide without warranty or guarantee of any kind and accepts no responsibility as to how the information is interpreted Health and safety regulations are the sole responsibility of the installer and totally unconnected to Celuplast Ltd The Guardian Roof is continually evolving and changes to product and specification can change at any time Updates to this guide will be posted on our w...

Страница 3: ...All window frames must be reinforced in order to take the weight of the Guardian Roof It is the sole responsibility of the installer to establish that the window frames are reinforced ...

Страница 4: ...Components Box Gutter ...

Страница 5: ...1 Fix window frame to ring beam using self tapping screws at a maximum if 600mm centres 2 Fix ring beams together using ring beam cleats ...

Страница 6: ...ther using cleats and self tapping screws 4 Connect rafters to ring beam using cleats and bolts provided 6 Gable rafters to be secured to the house wall using suitable fixings depending on wall structure Typical Spider assembly using pins and locking nuts provided ...

Страница 7: ...tres Fakro Window to be fitted to the V Notch Tiling always to start at the bottom left of the roof Always start with a full tile with a half tile above Felt roof using suitable breather membrane The overhang is 200mm Fakro Tile Flashing installed with Guardian Roof Tile ...

Страница 8: ...appings to be screwed from the side and hidden using the Guardian Tile repair kit Gutter brackets twist lock into the ring beam and Gutter locks on to brackets Box Gutter adapter fitted into the box gutter and sealed using suitable wet sealant Gutter joint then fitted to adapter for continuation around ring beam ...

Отзывы: