background image

 

 

 

Boston, U.S. 

100 Franklin St.

 

Boston, MA 02110 

 

Gothenburg, Sweden 

Arvid Wallgrens Backe 20, 

Gothenburg, 41346 

 

Virginia, U.S. 

2000 Kraft Dr., Suite 2125 

Blacksburg, VA 24060 

 

Kyoto, Japan 

46-29 Yoshida-Shimo Adachi-

cho, Sakyo-ku, Kyoto 

www.cellink.com | +1 (833) CELLINK 

5.

 

Select 

Calibrate

. Printhead 1 will calibrate automatically.  

 

6.

 

Repeat steps 4 and 5 for Tool 2 and Tool 3. There is no need to home the axes again.  

 

 

Proceed to calibrate the surface probe following these steps: 

 

1.

 

Make sure the surface probe is attached. 

 

 

 

 

 

Содержание BIO X Autocalibration Kit

Страница 1: ... potential for user error when calibrating the tip of the nozzle relative to the printing surface or to another nozzle It does this by probing and aligning all printhead nozzle tips in all axes X Y and Z and includes ABL ABL measures the print bed surface and adjusts all movements to follow its tilt and contours to improve the quality of bioprinted structures ABL compensates for any height differe...

Страница 2: ...9 Yoshida Shimo Adachi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 2 BIO X Autocalibration Kit Barcode D16110021178 Part Quantity Barcode Surface probe 1 000000020628 Surface probe stabilizer 1 000000020627 Surface probe magnet 1 D16110021355 Z station base 1 000000020625 Z station plate 1 000000020624 XY printhead calibration lever 3 000000020629 M4 screw 1 000000020419 ...

Страница 3: ...u and select Updates 6 Select and install the downloaded HeartOS NOTE Before installing the Autocalibration Kit verify that the autocalibration endstops are functional Follow the steps below 1 Visually inspect the following endstops The surface probe endstop This is the red button switch under the print box The Z probe endstop This is the metal or plastic switch on the top right side of the print ...

Страница 4: ...thenburg 41346 Virginia U S 2000 Kraft Dr Suite 2125 Blacksburg VA 24060 Kyoto Japan 46 29 Yoshida Shimo Adachi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 4 NOTE If any endstop components are misaligned absent or not activating contact the CELLINK Support team at support cellink com ...

Страница 5: ...nthead labeled by the green circle in the diagram 3 Remove the spacer and keep the M2 screw labeled by the red circle in the diagram 4 Insert the magnet into the surface probe stabilizer Polarity does not matter when inserting the magnet 5 Align the surface probe stabilizer and magnet such that the surface probe endstop is directly on top of the magnet 6 Being careful not to bend the red switch pr...

Страница 6: ...ep 3 Installing the XY printhead calibration lever 5 Insert the Z probe plate as shown It will click into place and pivot freely triggering the Z probe endstop when pressed down and resetting when released 1 Turn the BIO X on and navigate to the Utilities menu Select Printer Hardware then Sensors 2 Align the left and right edges of the XY lever to be parallel with the print bed edges along the Y a...

Страница 7: ...update or if experiencing calibration issues with automatic calibration HeartOS 1 7 directory Utilities Move and calibrate Start by calibrating the printheads following these steps 1 Load any of the compatible printheads in the three printhead mounts 3cc Pneumatic 10cc Pneumatic and Temperature controlled and place cartridges with conical nozzles inside the printhead Turn the screw to secure the c...

Страница 8: ... 8 2 Navigate to Utilities Select Move and calibrate 3 For Tool 1 select Home and wait for homing cycle to run 4 Use the arrows on the screen to move the printhead Place the nozzle of Printhead 1 on top of the XY printhead calibration lever as centered as possible Focus on the X and Y alignments ignore the Z alignment as it does not need to touch in the Z direction a Cross reference with correct a...

Страница 9: ...urg VA 24060 Kyoto Japan 46 29 Yoshida Shimo Adachi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 9 5 Select Calibrate Printhead 1 will calibrate automatically 6 Repeat steps 4 and 5 for Tool 2 and Tool 3 There is no need to home the axes again Proceed to calibrate the surface probe following these steps 1 Make sure the surface probe is attached ...

Страница 10: ...ink com 1 833 CELLINK 10 2 Select the Surface Probe tab under Utilities Move and calibrate as shown in the image below 3 Home the axes and move the surface probe so that it hovers over the XY printhead calibration lever as centered as possible Focus on the X and Y alignments ignore the Z alignment as it does not need to touch in the Z direction a Cross reference with correct and incorrect calibrat...

Страница 11: ...irginia U S 2000 Kraft Dr Suite 2125 Blacksburg VA 24060 Kyoto Japan 46 29 Yoshida Shimo Adachi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 11 4 Select Calibrate The surface probe will calibrate automatically 5 Remove the surface probe Remember to remove the probe when autocalibration is not running ...

Страница 12: ... runs ABL Be prepared to turn off your BIO X if ABL fails Leaving your BIO X unsupervised during the ABL process risks damage to your machine HeartOS 1 7 Bioprint Print Print Calibrate Automatic bed leveling 1 If you would like to run automatic bed and surface leveling only begin the bioprinting process as usual Select a model and surface 2 Enter your printer and layer settings 3 Navigate to the P...

Страница 13: ...oto www cellink com 1 833 CELLINK 13 6 A message will appear prompting you to attach the surface probe Attach the probe and select Continue 7 A progress screen will appear If necessary press Abort to cancel the procedure at any time After canceling the procedure or completing the ABL process the system will return to the calibration method menu 8 Use automatic calibration or remove the probe for m...

Страница 14: ... your BIO X in the event of automatic calibration failure Leaving your BIO X unsupervised during the automatic calibration process risks damage to your machine NOTE Automatic calibration is only supported for the 3cc Pneumatic 10cc Pneumatic and Temperature controlled Printheads HeartOS 1 7 Bioprint Print Print Calibrate Automatic Calibration 1 If you would like to run automatic bed leveling and a...

Страница 15: ...da Shimo Adachi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 15 5 A message will appear prompting you to attach the surface probe Attach the probe and select Continue 6 Ensure the XY printhead calibration lever is positioned in a straight vertical position Clear the bed of any tall objects 7 Verify all hardware components are ready 8 Select Start to begin the calibration process ...

Страница 16: ...achi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 16 9 After a homing cycle automatic calibration will begin and a progress screen will appear If necessary press Abort to cancel the procedure at any time 10 After the automatic calibration process is complete a message will appear prompting you to remove the surface probe Remove the surface probe and select Close to return to the print menu ...

Страница 17: ...Yoshida Shimo Adachi cho Sakyo ku Kyoto www cellink com 1 833 CELLINK 17 11 Press Start to proceed to bioprinting Removing autocalibration hardware for packing When packing your BIO X for transport remove the following parts XY printhead calibration lever Z station base Surface probe Note Tools are not required to remove these parts Ensure they are stored safely during transport ...

Отзывы: