Erecting Procedure
9
www.HGPTS.com
7. Pull the tent top over the frame.
IMPORTANT: Leave sidewalls on top of frame.
8. Take all eight of the 80” (203.20 cm) legs (Green/ HT2GST80) and slide
one end of each pole into the base plate fittings (F03BPHT) and pin using
pin & bail (HT570). Slide the pin through the hole in the base plate and leg
hole then connect the bail end around the pin.
9. Lift one side of the frame up and slide the legs (Green/ HT2GST80) with
base plates into the bottom of the two corner fittings (F01CORHT) and pin
using pin & bail (HT570). Slide the pin through the hole in the corner fitting
and leg hole then connect the bail end around the pin.