3
Install the screen at a location visible to all viewers; ideally, the screen should be
mounted in the central to the spectators. The lower third of the screen should be
about the eye level of the viewer. Install the screen straight and level, otherwise
there is a risk that the screen fabric is skewed when unwound. With this screen
you have the possibility to choose between four mounting variants. As a general
rule, the mounting brackets (b) should ideally be installed between 200 and
300mm in from both ends of the screen (see Fig. 1)
1. For installation on a solid stone / concrete wall, please use the
plastic dowels (i). Determine the position of the mounting
brackets (b) according to the housing dimensions and the
height of the projection screen. Draw a horizontal line (spirit
level) to install the two mounting brackets at the same height.
Before starting a mounting variant, the mounting bracket (b) must
be adjusted to its basic position: To do this, turn the lower safety
screw on the mounting bracket (b) counterclockwise so that the
bracket opens. Do not completely unscrew the screw.
Installing the screen
Electrical Spec
200-300
200-300
Figure 1
Voltage:
230V, 50Hz
Consumption: 130W (MAX)
0,4
Watt
(Standby)
Brown-Live (Up)
Black-Live (down)
Blue-Neutral
Yellow/Green Earth
Wall Mounting
ATTENTION! Make sure that you use a stable surface