background image

3

Install the screen at a location visible to all viewers; ideally, the screen should be 

mounted in the central to the spectators. The lower third of the screen should be 

about the eye level of the viewer. Install the screen straight and level, otherwise 

there is a risk that the screen fabric is skewed when unwound. With this screen 

you have the possibility to choose between four mounting variants. As a general 

rule, the mounting brackets (b) should ideally be installed between 200 and 

300mm in from both ends of the screen (see Fig. 1)

1.    For installation on a solid stone / concrete wall, please use the 

plastic dowels (i). Determine the position of the mounting 

brackets (b) according to the housing dimensions and the 

height of the projection screen. Draw a horizontal line (spirit 

level) to install the two mounting brackets at the same height. 

Before starting a mounting variant, the mounting bracket (b) must 

be adjusted to its basic position: To do this, turn the lower safety 

screw on the mounting bracket (b) counterclockwise so that the 

bracket opens. Do not completely unscrew the screw.

Installing the screen

Electrical Spec

200-300

200-300

Figure 1

Voltage:  

230V, 50Hz

Consumption:  130W (MAX)

  0,4 

Watt 

(Standby)

Brown-Live (Up)
Black-Live (down)
Blue-Neutral
Yellow/Green Earth

Wall Mounting

ATTENTION! Make sure that you use a stable surface

Содержание HomeCinema Electric Tension screen

Страница 1: ...Operation manual celexon HomeCinema Electric Tension screen Thank you for choosing a quality product from celexon Please read the instructions carefully before using the screen and keep them for futur...

Страница 2: ...assumes no responsibility for damage to property or personal injury if the screen is used outside the recommended specifications or if installed improperly Do not use this screen near heaters or air...

Страница 3: ...n screen fabric Further information can be found in the enclosed screen documentation d 1 x Hexagon socket adjuster g 1 x Trigger cable j 1 x Operation Manual k 2 x Eyelets for hanging mounts l 2 x RJ...

Страница 4: ...d stone concrete wall please use the plastic dowels i Determine the position of the mounting brackets b according to the housing dimensions and the height of the projection screen Draw a horizontal li...

Страница 5: ...bracket is located in the housing groove 2 Slide the housing towards the wall until it noticeably sits on the hooks 3 Once the housing is securely seated on the bracket tighten the lower safety screw...

Страница 6: ...safety screw clockwise This closes the bracket and makes the screen secure 1 For installation on a solid stone concrete ceiling please use the plastic dowels i Determine the position of the mounting b...

Страница 7: ...remote control please use the enclosed IR receiver h Insert the jack plug into the ext IR port on the left side of the screen housing and place the receiver so that it has line of sight contact with t...

Страница 8: ...ntrol Connect the IR receiver h to the Ext IR port and position the receiver so that the re is permanent visual line of sight between the remote control and the receiver Trigger With the trigger termi...

Страница 9: ...1BYTE 1BYTE 1BYTE nBYTE 1BYTE 1BYTE 485 B Black cable Start code Device address command code Command value Check code CRC16 0xAA ID0 ID1 ID3 ID4 COMMAND DATA crcH crcL 1BYTE 1BYTE 1BYTE 1BYTE 1BYTE 1B...

Страница 10: ...ID1 ID2 ID3 05 01 crcH crcL Stop 0x06 485 A 55 ID0 ID1 ID2 ID3 06 01 crcH crcL 485 B AA ID0 ID1 ID2 ID3 06 01 crcH crcL If the power is turned off for more than 10 seconds and then switched on again 1...

Страница 11: ...e contact your local authority and pollutant collection point Screen EMV Guideline EMC 2014 30 EU EN 55032 2015 EN 55035 2017 EN 61000 3 2 2014 EN 61000 3 3 2013 Low Voltage Directive 2014 35 EU IEC 6...

Отзывы: