P2522 Athena Erp lot9 EcoDesign
V0.2
Страница 1: ...P2522 Athena Erp lot9 EcoDesign V0 2 ...
Страница 2: ...aem Chabang Industrial Estate Moo 5 Tungsukhla Siracha Chonburi 20230 Thailand 3 1 c product model number P2522 3 1 d See the serial number on the physical system to determine the year of manufacture 3 1 e j PSU Efficiency and Power Factor Value Table From 80 Plus report P2522 PSU meets from 1 Mar 2020 PSU Model CPR02021 2M16 Watts 2000W System EUT Efficiency in Idle State Power Table Representati...
Страница 3: ...Low End Performance Configuration 3 1 k This product has been tested in order to verify that it will function within the boundaries such as temperature and humidity of the declared operating condition class A2 3 1 n FW and Secure data Deletion tool To delete data safely need the OS level software to be handled by Celestica s customer Celestica will support firmware per Erp requirements at free of ...
Страница 4: ...4 Website including to download the FW https hardware support azurewebsites net 3 3 a BBU Cobalt above 25G Neodymium in the PM1733 HDDs between 5g 25g ...
Страница 5: ...0 screws on heatsink Tools required Screwdriver with T30 Torx bit The screw torque should be 13 KGF CM Procedure Step 1 Disassemble the Heatsink 1 Use a T30 screw driver The screw torque should be 13 KGF CM 2 Disassembly must be followed by 4 3 2 1 order see the label on the heatsink Step 2 Disassemble the CPU 1 Then disassemble the CPU from the motherboard Figure 3 1 Install the CPU ...
Страница 6: ...6 WARNING For Sharp edges and corners please avoid injure when do assembling and dis assembling operation ...
Страница 7: ... Pan Head screw M3 x L4 5 Torque 4 0 5 KGF CM Tools required Screwdriver with PH2 bit Procedure 1 Click the button 2 The handle will open automatically 3 Hold the handle to pull the drive out of the chassis 4 Remove the screws and then remove the HDD from the carrier ...
Страница 8: ...d number of fastenings One 1 latch and one 1 handle per module Tools required None Procedure 1 Rotate the handle to a suitable angle 2 Keep pressing the pick and holding the handle 3 Pull the PSU out of the chassis ...
Страница 9: ...9 Controller Canister Type and number of fastenings Two 2 latches per controller canister Tools required None Procedure Rotate the handle then hold the handle to pull the canister out of the chassis ...
Страница 10: ...ould be operated by a skilled man after training Type and number of fastenings Two 2 locks on the controller canister cover Tools required None Procedure Press the two locks and pull the controller canister cover out in the direction as shown below ...
Страница 11: ...n shows below Users could refer to the installation method as shown in the following chapters Type and number of fastenings Tools required None Procedure 1 Remove the controller canister cover see Controller canister cover removal 2 Remove the PCIE module out from the canister 3 Remove the PCIE card from the slot ...
Страница 12: ...ser servicing any other time users should keep away from moving fan blades Type and number of fastenings Tools required None Procedure 1 Remove the controller canister cover see Controller canister cover removal 2 Unplug the connector and then remove the single fan ...
Страница 13: ... and number of fastenings plastic holder Tools required None Procedure 1 Push the M 2 card plastic holder outward 2 The card will open automatically 3 Pull the card out of the plastic holder Figure 3 2 M 2 card Removal ...
Страница 14: ...14 Trusted Platform Module TPM card Type and number of fastenings Tools required None Procedure Pull the TPM card out of the slot ...
Страница 15: ...15 Battery Backup Units Type and number of fastenings One 1 BBU handle Tools required None Procedure Pull the TPM card out of the slot 1 Rotate the BBU handle 2 Pull the BBU out of the canister ...
Страница 16: ...16 END OF DOCUMENT ...