Ceice TS-1032 Скачать руководство пользователя страница 11

10

Frequently Asked Questions

Why there is raw material tank, a screen prompt is still lack of material?

- -

When the remaining raw materials of less than about 1L-cylinder machine prompts lack of material. If the business at this time is not over yet, please timely feed

- -

After remaining raw material shortage tips can make 10 copies of ice cream, then if there is no supplementary material, the machine will be forced to stop selling

Why hardness setting has not changed, today's ice cream produced relatively soft?

- -

The ratio of raw materials was confirmed, the ratio will affect the forming state

- -

When the number of produced small, soft ice cream may be easily changed, it is recommended to increase the hardness by promotion or improvement provided

Why raw material tank there, but put no ice cream?

- -

This phenomenon is called cold cylinder, i.e., too much air results in cooling the cylinder can not be extruded ice cream the stirring shaft. Probably because there is no time after raw 

material addition, it may be rewound cutting the pot opening is blocked by ice cream

- -

Encountered not put ice cream, immediately press the "clean" button, and then pull up the expanded tube so that the raw material flowing into the cooling tank, the ice 

cream until it can be released back into the extruded tube, to normal operation

Why raw material will flow out from the bottom of the tube in?

- -

When the intermediate shaft seal is not properly installed or missing equipment, from the bottom of the hose feed machine flows to alert the user, in case this case, the material 

should be discharged as soon as possible and washing machine, according to page 4, FIG stirring shaft assembly reinstalling the orientation shown in ring

Troubleshooting

If an exception occurs, the screen will display fault Guide

- -

Please read the operating instructions displayed on the screen, according to one investigation process

- -

When troubleshooting or recurring, please add Shanghai Esse aftermarket micro letter for assistance:

Содержание TS-1032

Страница 1: ...TS 1032 automatic soft ice cream machine Instructions for use...

Страница 2: ...sponsible attitude carefully written in the instructions for use but does not guarantee the complete accuracy of the content Shanghai Esse has the right to improve the product without informing the us...

Страница 3: ...zard Must be grounded outlet Doing so may cause an electric shock hazard Not pinch forced bending or twisting the power cable do not own processing power cord and plug do not hang on the power line Ot...

Страница 4: ...en trigger protection To avoid affecting the life of the machine or business interruption please do not place anything hot air outlet Do not wash long dry run or when cleaning in the absence of raw ma...

Страница 5: ...to Falcon When the agitator shaft is not rotated correctly installed After stirring shaft properly installed firmly pressed inwardly resilient ring may be felt If the stirring blade axis direction is...

Страница 6: ...e first insert tube extruded raw materials see Start making ice cream chapter To ensure the quality of the ice cream then pour the first insert tube extruded raw materials see Start making ice cream c...

Страница 7: ...ll the switch The mask in the holder and rotation of the valve body conforming to When cleaning the tray remove the thumb screw the rotation of the tray housing removed as shown in FIG Placing ice cre...

Страница 8: ...plunger is closed First 2 l Feedstock into the pot so that material flowing into the cooling tank check valve and a bottom feed hose for leaks 3 Reconfirm the plunger is closed First 2 l Feedstock int...

Страница 9: ...e if not dry in time may lead to rapid propagation of bacteria hazardous to their health 1 Press the Stop key the extruded pipe is removed and the pot stir bar into the container to be washed 2 Open t...

Страница 10: ...he machine directly into the inner rough texture prone to make nuggets and easier to melt Long material should be placed before the agitation was poured into the machine again and so prevent precipita...

Страница 11: ...ot be extruded ice cream the stirring shaft Probably because there is no time after raw material addition it may be rewound cutting the pot opening is blocked by ice cream Encountered not put ice crea...

Страница 12: ...rd Editing Device Management passwords Splice number of steps Only operate under the guidance of professionals Splice start waiting time Only operate under the guidance of professionals Pump test Only...

Отзывы: