Step 29: Final Swing Post Assembly
Hardware
Pre-drill all holes using a 3/16” drill bit before installing the lag screws.
Note: Tighten all bolts from Step 27 series before installing lag screws.
A:
Attach 1 (LS9) 5/16 x 4-3/4” Lag Screw (with flat washer) into each (272) SW Post, as shown in fig. 29.1.
B:
Attach 1 (LS9) 5/16 x 4-3/4” Lag Screw (with flat washer) into remaining hole of the Heavy G-Bracket into
(260) Engineered SW Beam. (fig. 29.1)
3 x
5/16 x 4-3/4” Lag Screw
(5/16” flat washer)
LS9
272
260
Fig. 29.1
5/16” Flat
Washer
272
Heavy
G-Bracket
LS9
5/16” Flat
Washer
LS9
98
Содержание F25650
Страница 109: ...NOTES 109 support cedarsummitplay com ...
Страница 110: ...NOTES 110 support cedarsummitplay com ...
Страница 111: ...NOTES 111 support cedarsummitplay com ...