66
Step 25: Attach Hand Grips to Fort
Pre-drill all holes using a 3/16” drill bit before installing the Lag Screws
A:
Measure 6” up from the floor boards on both (2181) Short Post and (2180) Post then attach 1 Hand Grip per
post with 2 (LS1) 1/4 x 1-1/2” Lag Screws (with flat washer) per Hand Grip. (fig. 25.1)
Hardware
4 x
1/4 x 1-1/2” Lag Screw (1/4” flat washer)
LS1
Other Parts
2 x Hand Grips
Hand Grip
1/4” flat
washer
Fig. 25.1
2181
LS1
1/4” flat
washer
LS1
1/4” flat
washer
LS1
1/4” flat
washer
Hand Grip
2180
6”
Back Wall
Содержание F23890
Страница 98: ...98 support cedarsummitplay com NOTES ...
Страница 99: ...99 support cedarsummitplay com NOTES ...