![cecotec 05341 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/cecotec/05341/05341_instruction-manual_2578203015.webp)
ENGLISH
15
READY WARM 4000 SLIM FOLD
•
Once the product has been properly assembled, remove the back panel.
•
Introduce the gas cylinder in the back of the heater with the valve outlet facing outwards.
•
Screw the correct regulator onto the gas cylinder valve clockwise. Screw it by hand only,
do not use a spanner.
LEAK TEST
This must be carried out in a well-ventilated area, free from any open flames or other sources
of ignition.
1.
With the regulator connected to the cylinder, turn on the gas cylinder valve 1 and 1/2 turns
anti-clockwise.
2.
Brush and clean the connection between the regulator and the cylinder and from the
hose to the gas cylinder valve with a 50:50 solution of detergent and water.
3.
The appearance of bubbles is an indication of a leak.
IF A LEAK IS DETECTED:
1.
Turn off the cylinder valve (clockwise).
2.
Disconnect the regulator from the gas cylinder.
3.
Take the gas cylinder to a cool, outdoor, well-ventilated area.
IF NO LEAK IS DETECTED:
1.
Slightly turn the cylinder to allow the regulator and hose to fit inside the product.
2.
Place the back panel back in its place.
WARNINGS:
•
Do not use the heater if a leak is found.
•
Do not use a naked flame for leak testing.
•
Do not operate any electrical equipment in the presence of a gas leak.
500 mm
500 mm
1000 mm
1000 mm
Содержание 05341
Страница 2: ......
Страница 55: ......
Страница 56: ...www cecotec es Grupo Cecotec Innovaciones S L C de la Pinadeta s n 46930 Quart de Poblet Valencia Spain ...