5
SA5 OPERATIONS MANUAL & PARTS LIST
(Rev. 6/2020)
1.2 – PRECAUTIONS
READ THROUGH THE "OPERATIONS MANUAL" COMPLETELY BEFORE
ATTEMPTING TO OPERATE THE MACHINE.
CLEANOUT, POT LID, INLET CAP AND HOSES MUST BE IN PLACE AND
TIGHTLY SECURED BEFORE OPERATION IN THE DISCHARGE MODE.
TANK DISCHARGE PRESSURE MUST NOT EXCEED 10 PSI.
REGULATOR AND RELIEF VALVES ARE SET BEFORE SHIPMENT AND
SHOULD NOT BE CHANGED AS THE USE OF EXCESSIVE PRESSURE
COULD CAUSE SERIOUS INJURY OR DAMAGE. OPERATING
DISCHARGE PRESSURE IS 6 PSI.
DO NOT ATTEMPT TO OPEN POT LID, CLEANOUT OR BLEED-OFF CAP
BEFORE RELIEVING PRESSURE IN THE TANK.
BLOCK WHEELS OF THE MACHINE TO PREVENT UNINTENTIONAL
MOVEMENT.
WEAR SAFETY GOGGLES TO PROTECT EYES FROM SPLASHING LIQUIDS.
KEEP HANDS AND FINGERS CLEAR OF POT OPENING WHEN
REMOVING OR REPLACING FILTER BASKET OR FILTER
ASSEMBLY.