background image

User Manual

 

1-3K Battery pack rack

 

 

Содержание UPO-11-3RT

Страница 1: ...User Manual 1 3K Battery pack rack...

Страница 2: ......

Страница 3: ...top of the battery bank Keep the battery box 20 cm away from the wall Make sure the battery box is installed within the proper environment as specified 0 40 C and 30 90 non condensing humidity Do not...

Страница 4: ...with bare hands CAUTION A battery can present a risk of electrical shock and high short circuit current The following precaution should be observed when working on batteries 1 Remove watches rings or...

Страница 5: ...e to the battery box and extend the life of the batteries Please follow the instructions below 1 Keep at least 20cm 8 inches clearance from the rear panel of the unit from the wall or other obstructio...

Страница 6: ...e 3 Type of Battery Required This battery box has been designed to operate with the following types of batteries 24V 9Ah Version 2 pieces of 12V 9Ah batteries 24V 18Ah Version 4 pieces of 12V 9Ah 2 2...

Страница 7: ...ORE PERFORMING THE FOLLOWING SEQUENCE OF OPERATIONS Battery Box 24V Step 1 Open the package and place the battery box on a horizontal plane Step 2 Remove the removable front panel part by pulling it f...

Страница 8: ...left side of the unit by unscrewing the 2 screws Pull up first and then push the battery fixing plate Note To install the second branch of batteries repeat the same procedures on the battery fixing p...

Страница 9: ...ery box Step 7 Connecting the batteries following the wiring diagram shown in next chapter Step 8 Put correct batteries inside with the metal plate Note To install the second branch of batteries repea...

Страница 10: ...from the lower extremity Step 3 Remove the fixed part of the front panel by removing the 2 screw present Step 4 Remove the metal top cover of the battery box by unscrewing 6 screws present on the two...

Страница 11: ...ies repeat the same procedure on the battery fixing plate on the right side of battery box Step 6 Now it is possible to put the batteries inside following the picture below in the following drawing is...

Страница 12: ...cover back to the unit Close the frontal fixing plate and the two parts of the front panel and secure it with screws Step 10 Then connect the battery box to the UPS Battery Box 48V Step 1 Open the pac...

Страница 13: ...xing plate present on the left side of the battery box by unscrewing the 2 screws present Note To install the second branch of batteries repeat the same procedure on the battery fixing plate on the ri...

Страница 14: ...tep 8 Put all batteries inside with the metal plate Note To install the second branch of batteries repeat the same procedure on the right side of battery box Step 9 Put metal top cover back to the uni...

Страница 15: ...it from the lower extremity Step 3 Remove the fixed part of the front panel by removing 2 screw present Step 4 Remove the metal top cover of the battery box by unscrewing 8 screws present on the two s...

Страница 16: ...te on the right side of battery box Step 6 Now it is possible to put the batteries inside following below picture in the following drawing are indicated the fasten positions for the correct batteries...

Страница 17: ...ries repeat the same procedure on the right side of battery box Step 9 Put metal top cover back to the unit Close the frontal fixing plate and the two parts of the front panel and secure it with screw...

Страница 18: ...5 Wiring Diagram Battery Box 24V Picture example as below Batt Link PCBA Batt Link PCBA Breaker 1st battery bench 2nd battery bench RED BLACK RED BLACK 1 3K Battery pack rack www cdpups com English...

Страница 19: ...n from external battery connector to PCB is already present inside the battery box All the other cable connection should be followed by wiring diagram 450M M 450M M 350M M 350M M 1 3K Battery pack rac...

Страница 20: ...Battery Box 36V Picture example as below Batt Link PCBA Batt Link PCBA Breaker 1st battery bench 2nd battery bench RED BLACK RED BLACK 1 3K Battery pack rack www cdpups com English...

Страница 21: ...external battery connector to PCB is already present inside the battery box All the other cable connection should be followed by wiring diagram 450M M 350M M 350M M 450M M 150M M 150M M 1 3K Battery p...

Страница 22: ...Battery Box 48V Batt Link PCBA Batt Link PCBA Breaker 1st battery bench 2nd battery bench RED RED BLACK BLACK 1 3K Battery pack rack www cdpups com English...

Страница 23: ...connection from external battery connector to PCB is already present inside the battery box All the other cable connection should be followed by wiring diagram 280M M 280M M 220MM 4 260MM 300MM 1 3K B...

Страница 24: ...Battery Box 72V Batt Link PCBA Batt Link PCBA Breaker 1st battery bench 2nd battery bench RED RED BLACK BLACK 1 3K Battery pack rack www cdpups com English...

Страница 25: ...le connection from external battery connector to PCB is already present inside the battery box All the other cable connection should be followed by wiring diagram 280M M 240M M 380M M 380M M 1 3K Batt...

Страница 26: ...he unit 4 hours Store the unit covered and upright in a cool dry location During storage recharge the battery in accordance with the following table Storage Temperature Recharge Frequency Charging Dur...

Страница 27: ......

Страница 28: ...00156 Colombia 01800 5181617 Costa Rica 800 435737 El Salvador 800 6773 Honduras 800 25616099 M xico 001800 514 8611 Panam 011 00800 2268611 Per 0800 54674 Rep blica Dominicana 1888 7514876 Venezuela...

Отзывы: