5
CDL Maple Sugaring Equipment
ASSEMBLY AND INSTALLATION
• Please make sure to follow the steps below to ensure proper operation of the smoker
• Do not forgot to paint the components before assembling the unit. Let the parts dry for at
least 8 hours before assembling.
SMOKER DOOR CONTOUR PANEL
LOWER DEFLECTOR
SIDE PANEL
REAR PANEL
TOP PANEL
GRATE SQUARE
DOOR ASSEMBLY
FIRE COVER PANEL ASSEMBLY
#1 DOOR HINGE SQUARE
#2 DOOR HINGE SQUARE
UPPER DEFLECTOR
VENTILATION DISK
STOVER NUT 5/16-18 X ¾” SS
HEX. NUTS ¼-20 ZINC
ROUND HEAD SCREW ¼-20 SS
HEX. BOLT 5/16-18 X ¾” ZINC
EVAP-O-GRILL HANDLE
2” THERMOMETER FOR BBQ
HEX. NUT M8 X 1 SS
NOT ON DRAWING
Item number
Qty