
Diagram
*FF6 pictured
PARTS LIST
A
Halyard Top Fitting
2011
B
Luff Extrusion/Foil
LFF2
C
Halyard Assembly
1932
D
Furling Drum/Spool
2010
E
Shackle (2)
2007
F
Anchor Pin (2)
1998
G
Luff Support Pin
2009
H
Cup
1807
I
Anti-Rotation Strap
1081
J
Tack Tension Line
7022-4
-
Main Bearing
1033
-
Ball Bearing Assembly
1276
-
Thrust Washer
1253
UNCOILING INSTRUCTIONS
CAUTION: READ BEFORE OPENING
Coiled luffs have a lot of stored energy and can spring open
with force when restraining tape is cut. It is recommended to
wear face and eye protection. Please refer to instructions
below.
The sooner you begin the uncoiling and straightening process,
the faster and easier it will be to straighten the luff.
*
The luff should remain coiled for no longer than 2 weeks
Instructions for uncoiling the luff:
Note
: it’s best to have one person cutting the bands with at
least one other person holding onto the luff firmly, ensuring it
doesn’t spring out
1) Stand the luff on its side with the tail at the top
2) Have one person stand with one foot on the inside of the
luff while holding onto the tail firmly
3) The second person should then cut the band of tape near
the tail, while the first person is firmly holding onto the tail
and gently letting out the luff
4) Proceed to cut the next bands one at a time using the same
process
5) Carefully cut the last band, ensuring everyone is clear