CDA TC28CH Скачать руководство пользователя страница 2

 

Installation 

 
1. 

Screw studded rod (D) into the base of the tap (A). 

 

2. 

Place the upper seal (C) into the base plinth (B) then place the base plinth (B) onto the bottom of the tap (A). 

 

3. 

Screw the hot & cold water tail pipes (I & J) into the base of the tap (A) as shown. 

 

4. 

Place the mixertap (A) and base plinth (B) onto the sink/worktop, passing the tail pipes (I & J) and studded rod (D) through the tap hole and base 
plinth (B) 

 

5. 

Pass the triangular stabiliser (E), lower gasket (F) and then the fixing bracket (G) over the studded rod (D) and around the flexible tail pipes (I & J) 

 

6. 

Fasten the fixing nut (H) securely onto the fixing stud (D) to fix the tap (A) into its correct location. 

 

7. 

Connect the hot and cold tail pipes (I & J) to the water mains using ½” BSPx15mm compression fittings. Note: Non-return valves will be pre-
inserted into tail pipes (I & J). 

 

 

Parts and Contents 

 

Key 

Description 

Qty 

 

Mixertap body 

Base plinth 

Upper seal 

Fixing stud 

Triangular stabilising bracket 

Lower gasket 

Fixing bracket 

Fixing nut 

Hot Flexi tail 
(with integral NRV) 

Cold Flexi tail 
(with integral NRV) 

 

 

After installation: 

 

Once you have visually checked the new fittings and connections, ensure that all taps are closed except the new mixer tap, which should be left open. Turn 
on the water supply at the mains stop cock. As the system starts to refill, 

check carefully for leaks

. Once you are fully satisfied that there are no leaks, turn 

on the water heating.  

 

Clean the tap to remove any marks created during installation as instructed then replace the bag that has been provided to protect the tap until it is ready for 
use.

 

Отзывы: