CD Automation srl
REVO E-3PH from 25A to 500A
User’s Manual
10
3
Quick Start
Caution:
this procedure must be performed only by qualified persons.
If the Order Code of the Thyristor unit is in line with what you really need, then REVO E has been
already configured in Factory and you just need to do the following steps:
1.
Verify the REVO E Sizing. Making sure that:
The load current is equal or less than the MAX current of REVO E.
The load voltage is equal or less than the MAX voltage of REVO E.
(see par. 4)
2.
Verify the Order Code
(see par. 5.2)
3.
Verify the Installation
(see par. 6)
4.
Verify the Diagram of control connection:
All auxiliary connections must be done in line with wirings on this manual.
Verify that there isn’t a short circuit on the load.
(see par. 7.4)
5.
Supply the Electronic boards
(see Order Code)
6.
If not specified in the Order Code:
Set the Load Voltage in the parameter P116
.
Set the Load Current in the parameter P119
.
7.
With Burst Firing (BF) or Heater Break Alarm (HB)
make the Calibration procedure
(see par. 9.4)
The REVO E Thyristor unit is ready to start.
Содержание REVO E 3PH
Страница 2: ......
Страница 3: ......
Страница 13: ...CD Automation srl REVO E 3PH from 25A to 500A User s Manual 13 5 2 Order Code ...