MAIN PARTS OF THE ELECTRICAL SYSTEM
> TANK PROBE WITH SCREWS “SS/P” - signalization of full waste water tank.
>
“PC380-ST”
CONTROL PANEL
- mains’ control, battery test, tank test, temperature test and clock unction
f
> 12V DISTRIBUTION BOX “DS3 0-ST”
0
- main relais, battery parallel relais (12V - 70A), fridge relais, pump
relais, car battery recharging device, protection fuses.
> ELECTRONIC TANK PROBE - it measures the content of the
water tanks, visualization in “%”
fresh
.
> LEISURE BATTERY “B2” - it gives power to all the users.
>
BATTERY “B1”
CAR
.
ADVICE AND CHECKS
BATTERY CHARGER
The acid kept in the batteries is poisoning and
corrosive. Avoid any contact with skin and eyes.
In case of a longer stop, the services battery has to be
disconnected or recharged regularly.
BATTERIES
Read with care the instructions of use and
maintenance of the batteries.
If the battery is completely discharged it needs
recharging for almost 10 hours. If discharged for more
than 8 weeks it may be damaged.
Check periodically the level of the liquid of the battery
(with acid); the GEL battery does not need any
maintenance but a countinuous recharging.
If the leisure battery is removed, isolate the positive
pole (in order to avoid short-circuits during an
accidental car engine starting).
Check the correct tightening of the connection binding
screw and brush off the oxyde.
The battery charger must be installed in a dry and
ventilated place.
In case of battery charger’s misuse, the guarantee
falls off and the manufacturer declines all responsi
bility for damages to people and things.
-
The installation of this device must be carried out by
specialized technicians.
Do not carry out any maintenance when the battery
Do not cover air intakes and assure an appropriate
ventilation.
Before disconnecting the battery charger from 230V
power supply, turn the security switch off.
TANK PROBES
230V CUT-OUT BOX
Before taking away the cover, check that the 230V
socket is disconnected.
In order to avoid damages to the box, check the
correct tightening of the connections.
In order to cut power to the whole 230V system,
please take care that the 230V main switch must be
on the “0” (OFF) position.
In case of automatic switch break, find the damage
before giving power again to the electrical system.
Connect and disconnect the external 230V net only
when the main switch is off.
Replace the fuses after finding out the real cause of
the damage only.
When the fuses are replaced respect the value of the
amperage established.
charger is connected to the 230V power supply net.
Never let water in the tanks for long time, in order to
avoid foulings, especially in the waste water tank.
FUSES
IMPORTANT Maintenance interventions on the electric implant must be carried out by
specialized personnel. Before carrying out maintenances disconnect the battery and the
230V alimentation line.
:
EN
16
Содержание PC380-ST
Страница 2: ......
Страница 49: ...49 INSTALLATION PC380 ST ...
Страница 50: ...50 NOTE ...
Страница 51: ...51 NOTE ...