14
15
TRUE ON LINE UPS
TRUE ON LINE UPS
5. Connection and Operation
THE SYSTEM MAY BE INSTALLED AND WIRED ONLY BY QUALIFIED
ELECTRICIANS IN ACCORDANCE WITH APPLICABLE SAFETY
REGULATIONS!
5.1 Connection and operation for 1K / 2K / 3K
WHEN INSTALLING THE ELECTRICAL WIRING, PLEASE NOTE THE
NOMINAL AMPERAGE OF YOUR INCOMING FEEDER.
1)
Inspection
:
Inspect the packaging carton and its contents for damage. Please inform the transport
agency immediately should you find signs of damage.
Please keep the packaging in a safe place for future use.
Note: Please ensure that the incoming feeder is isolated and secured to prevent
it from being switched back on again.
1/2/3KVA UPS Input connection
1KVAH External Battery Connection
2/3KVAH External Battery Connection
1/2/3KVA UPS Output Connection