CAYMON GPR Series Скачать руководство пользователя страница 2

STEP 7

STEP 8

STEP 9

Install the equipment into the rack, wire it up 

and push the slide out platform back into the 

base. It will lock automatically when inserted.

Assemble the front lock cover panel to se-

cure the slide out platform to the base and 

cover the locking tabs.

The rack is now well installed and ready for 

use.

INSTALLATION MANUAL

GPR SERIES

ATTENTION

To guarantee proper functionality of the 

slide-out system, it is important that the 

GPR rack is secured to the supporting floor 

or platform. The fasteners for securing are 

depending of the type of supporting surface 

and are not included with delivery of the 

rack.

Отзывы: