
29
[10]
11
[10]
x 2
Fit the chimney sections to the bracket. Connect top of the ducting tube to vent kit as per manufacturers
instructions.
12
Remove the protective film.
For recirculating option refer to
Care and maintenance
section.
For electrical connection see
Technical and legal information
section.
Содержание CHK60
Страница 1: ...CHK60_70_90SS v1a Barcode 8422248032308 8422248032315 8422248032322 GB IE CHK60 70 90SS Chimney Hood...
Страница 2: ...01 x 1 04 x 1 05 600mm x 2 02 x 2 03 x 1 1 1 09 x 6 3 9 x 32mm 10 x 4 3 4 x 10mm 08 x 6 06 x 1...
Страница 3: ...GB IE Cooker Hood 04 FR Hotte Aspirante 20 Installation 22 CHK60 70 90SS 3...
Страница 5: ...5 Getting Started Getting started GB IE Before you start 06 Safety 08...
Страница 22: ...Installation 22 Appendix Appendix GB IE...
Страница 27: ...27 07 08 Replace the aluminium Filter Fix the collar using mounting screw 10 x 2 06 10 06...
Страница 30: ...Notes...
Страница 31: ...Notes...
Страница 32: ...GB IE CNA Trading U K Ltd Hillbrow House Hillbrow Road Esher Surrey KT10 9NW...