background image

— 3 —

CP238

T200

VR730

CP750

CP711

CP324

CP705

CP725

VR710

VR303

CP344

VR300

T300

CP308

VR301

CP106

CP107

CP105

CP108

VR100

CP101

CP109

ADJUSTMENT

Top View

Bottom View

1. Vcc2 adjustment, Vcc7, Vcc6, Vcc5, Vee1 voltage check
2. LLD coil adjustment
3. Free running frequency adjustment
4. VOM AC and VCOM DC coarse adjustment
5. Contrast, Bright adjustment
6. COLOR adjustment
7. BCC coil adjustment
8. VCOM DC adjustment

Preparations

1. For the above 1 - 7 adjustments, connect JACK to the ground GND(OV).

Adjustment And Test Point Locations

Отзывы: